Contractor · General building

Dillard Cheryl

10 building permits since 2018 in Orleans Parish, LA.

Building permits
10
Reported job value
—
Active
2018–2021
Latest permit
Jan 19, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA10

Permits by year

By issue date (application date where there is none).

024
4
201820192021
View as table
YearPermits
20184
20194
20212

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels9
  • Plumbing2
  • HVAC1
  • Electrical1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)8
  • Renovation (Structural)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 19, 2021Renovation (Non-Structural)Bakery corridor RENOVATION, relocate bakery cooler, relocate door on bakery freezer, relocate ISD, remove 8 stalls, add 16 stalls in new locationOrleans Parish—
Jan 4, 2021Renovation (Non-Structural)Update layout of front check out areaOrleans Parish—
Nov 25, 2019Renovation (Non-Structural)Scope of work to include adding exterior doorwayOrleans Parish—
Nov 22, 2019Renovation (Non-Structural)ADD #2 - Adding Interior Traffic Flow Egress Gates near entrancesOrleans Parish—
Nov 7, 2019Renovation (Non-Structural)Add gates near entrance for traffic flow and theft detouranceOrleans Parish—
Aug 13, 2019Renovation (Non-Structural)Add gates to entrance for theft deterrent.Orleans Parish—
Dec 4, 2018Renovation (Non-Structural)Minor interior remodel that will include apparel fixture repair and replacement, a new fitting room with some additional power requirements, new lit end cap sigOrleans Parish—
Aug 13, 2018Renovation (Structural)Walmart On-Line Grocery Pickup 912.213-Add fabric canopy with paving/striping for online grocery pickup parking stalls with signage. Add CMU Expansion area and Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • C/o issued6
  • Closed3
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.