Contractor · Electrical
Christopher Hoover
10 building permits since 2026 in Jackson city, MS.
- Building permits
- 10
- Reported job value
- —
- Active
- 2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Jackson city, MS10
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Electric meters1
Permit types
As the building departments classify them.
- Electrical Permit10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | Electrical Permit | Need power disconnected so we can replace meterbase then need it reconnected | Jackson City | — |
| Oct 2, 2026 | Electrical Permit | Repair meterbase | Jackson City | — |
| Sep 30, 2026 | Electrical Permit | Replaced meterbase | Jackson City | — |
| Sep 18, 2026 | Electrical Permit | Need a temp pole hook up | Jackson City | — |
| Sep 8, 2026 | Electrical Permit | There was a fire in a nearby unit. This unit wasn't affected. Just needs to be inspected for power to be turned back on. | Jackson City | — |
| Sep 8, 2026 | Electrical Permit | A nearby unit had a fire. This unit was not affected. Just needs to be inspected so they can get power back on. | Jackson City | — |
| Sep 3, 2026 | Electrical Permit | Fire in connecting building. This unit was not affected but needs power back on. | Jackson City | — |
| Aug 28, 2026 | Electrical Permit | No work complete. Needs reconnection after fire in seperate unit | Jackson City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.