Contractor · Electrical

Bryant

10 building permits since 2022 in Los Angeles city, CA.

Building permits
10
Reported job value
—
Active
2022–2023
Latest permit
Mar 29, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA10

Permits by year

By issue date (application date where there is none).

048
8
20222023
View as table
YearPermits
20228
20232

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • Solar5
  • Battery storage1
  • Roofing1

Permit types

As the building departments classify them.

  • Electrical10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 29, 2023Electrical[EPLAN] 9.25 kWDC/8.44 kWAC Roof mounted PV using 25 modules , 25 micrLos Angeles City—
Feb 24, 2023Electrical(EPlan) PV1 PC for installation of roof mounted solar panels. PV systeLos Angeles City—
Dec 6, 2022Electrical[ePlan] Installation of 1 Tesla Powerwall into an existing PV system.Los Angeles City—
Nov 9, 2022ElectricalEplan' Revision to approved set to match field match installationLos Angeles City—
Oct 17, 2022Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 8.12 KWac, SYSTLos Angeles City—
Aug 25, 2022Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 6KWac, SYSTEM ILos Angeles City—
Aug 22, 2022Electrical—Los Angeles City—
Jul 12, 2022Electrical[ePlan] Installation of a new 7.7 kWDC PV system with 21 modules and 1Los Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.