Contractor · General building

BROADBENT W MATTHEW & BARBARA J

10 building permits since 2012 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2012–2022
Latest permit
Aug 10, 2022

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

024
4
201220132016201720212022
View as table
YearPermits
20121
20131
20162
20171
20214
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels3
  • Roofing3
  • HVAC2
  • Kitchens2
  • Plumbing2
  • Electrical2
  • Bathrooms1
  • Windows & doors1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 10, 2022BuildingReplace water heater with associated piping and venting at an existing at an existing structure. Install minimum 1.5”m piping insulation for the first 5 feet ofSanta Cruz County—
Jun 2, 2021BuildingNote state license type and must have W/C Ins. Tear off or overlay roof at an existing structure, install new sheathing as required with class “B” or better appSanta Cruz County—
Mar 3, 2021BuildingMechanical permit to install new/replacement force Air Unit/ air condition unit with associated piping and venting to an existing habitable structure. Install lSanta Cruz County—
Feb 23, 2021BuildingLRA, CENTRAL FPD Replace electric sub panel with new sub panel at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smokSanta Cruz County—
Feb 23, 2021BuildingExtension to permit B-132449 to extend until 7/17/2021Santa Cruz County—
Nov 17, 2017BuildingCentral Fire - LRA Replace-in-kind 1 sliding glass door at an existing SFD. Bedroom windows need 5.7 sq ft minimum net clear opening. Refer to 2013 Energy EfficSanta Cruz County—
Oct 24, 2016BuildingInterior remodel at an existing Townhouse to include remove structural wall between kitchen & dining area, add structural beam & foundation footing.Santa Cruz County—
Sep 8, 2016BuildingAPLS-FPD LRA *VOID Mech Permit B-132499 for venting dryer through roof. Electrical/mechanical & plumbing permit for the renovation of a kitchen and 2 bathrooms Santa Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

BROADBENT W MATTHEW & BARBARA J — Building Permits & Contractor Profile | Buildstats