Contractor · Electrical

BERNICK DAVID L & DEBRA C

10 building permits since 2010 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2010–2025
Latest permit
Jun 26, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

024
4
2010201720222025
View as table
YearPermits
20101
20141
20171
20201
20224
20231
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical6
  • Solar2
  • Battery storage2
  • HVAC1
  • Remodels1
  • Roofing1
  • EV chargers1
  • Windows & doors1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 26, 2025BuildingGo online and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(5.22)kW, (18) modules photovoltaic Santa Cruz County—
Nov 6, 2023BuildingInstall (1) electric vehicle charging system(s) (EVCS) 48A at existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smoke and cSanta Cruz County—
Nov 4, 2022BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a (10.08)kWh, (1) battery energy storage systemSanta Cruz County—
Jul 24, 2022BuildingReplace electrical service panel with a new <400A service panel at an existing structure. Install listed smoke detectors and carbon monoxide alarms or combinatiSanta Cruz County—
Jul 24, 2022BuildingElectrical permit includes new wiring/lights/switches, for renovations at an existing structure. Install listed smoke detectors and carbon monoxide alarms or coSanta Cruz County—
Jul 24, 2022BuildingElectrical permit includes replace garage subpanel replace house subpanel, split board for future critical load. Add Enphase IQ switch for (future backup power)Santa Cruz County—
Sep 29, 2020BuildingNote state license type and must have W/C Ins. Tear off or overlay roof at an existing structure, install new sheathing as required with class “B” or better appSanta Cruz County—
Aug 28, 2017BuildingZayante Fire - SRA = MOD Replace 37 windows & 2 exterior doors in kind at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combinatSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.