Contractor · Electrical
BERNICK DAVID L & DEBRA C
10 building permits since 2010 in Santa Cruz County, CA.
- Building permits
- 10
- Reported job value
- —
- Active
- 2010–2025
- Latest permit
- Jun 26, 2025
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA10
Permits by year
By issue date (application date where there is none).
024
4
2010201720222025
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 1 |
| 2014 | 1 |
| 2017 | 1 |
| 2020 | 1 |
| 2022 | 4 |
| 2023 | 1 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical6
- Solar2
- Battery storage2
- HVAC1
- Remodels1
- Roofing1
- EV chargers1
- Windows & doors1
- Electric meters1
Permit types
As the building departments classify them.
- Building10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 26, 2025 | Building | Go online and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(5.22)kW, (18) modules photovoltaic | Santa Cruz County | — |
| Nov 6, 2023 | Building | Install (1) electric vehicle charging system(s) (EVCS) 48A at existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smoke and c | Santa Cruz County | — |
| Nov 4, 2022 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a (10.08)kWh, (1) battery energy storage system | Santa Cruz County | — |
| Jul 24, 2022 | Building | Replace electrical service panel with a new <400A service panel at an existing structure. Install listed smoke detectors and carbon monoxide alarms or combinati | Santa Cruz County | — |
| Jul 24, 2022 | Building | Electrical permit includes new wiring/lights/switches, for renovations at an existing structure. Install listed smoke detectors and carbon monoxide alarms or co | Santa Cruz County | — |
| Jul 24, 2022 | Building | Electrical permit includes replace garage subpanel replace house subpanel, split board for future critical load. Add Enphase IQ switch for (future backup power) | Santa Cruz County | — |
| Sep 29, 2020 | Building | Note state license type and must have W/C Ins. Tear off or overlay roof at an existing structure, install new sheathing as required with class “B” or better app | Santa Cruz County | — |
| Aug 28, 2017 | Building | Zayante Fire - SRA = MOD Replace 37 windows & 2 exterior doors in kind at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combinat | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Not stated2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.