Contractor · General building
BALDWIN MECHANICAL CONTRACTORS, INC.
10 building permits since 2022 in Howard County, MD.
- Building permits
- 10
- Reported job value
- —
- Active
- 2022–2025
- Latest permit
- Sep 4, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD10
Permits by year
By issue date (application date where there is none).
01.53
3
2022202320242025
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 1 |
| 2024 | 3 |
| 2025 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing10
- Remodels9
- Additions9
- Kitchens3
- Electrical3
- Water heaters3
- Bathrooms2
Permit types
As the building departments classify them.
- Commercial Plumbing Addition Alteration Permit9
- Commercial Plumbing New Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 4, 2025 | Commercial Plumbing Addition Alteration Permit | ASCEND ONE BUILDING/Relocate 1st floor toilet and lavatory. Relocate 2nd floor (6) toilets, (2) urinals, (2) lavatory, (2) showers, (4) countertop sinks and (1) | Howard County | — |
| Aug 11, 2025 | Commercial Plumbing New Permit | Add chlorinator to domestic water | Howard County | — |
| Apr 22, 2025 | Commercial Plumbing Addition Alteration Permit | HOWARD COUNTY MEDICAL CENTER/ ground floor - 2- Lavatory Sinks, 1 kitchen sink | Howard County | — |
| Jun 21, 2024 | Commercial Plumbing Addition Alteration Permit | STERILE PROCESSING ROOMS/HOWARD COUNTY GENERAL HOSPITAL/ RENOVATION TO REPLACE EXISTING STERILZATION EQUIPMENT/INSTALLING (2) 3 INCH FLOOR DRAINS, 1-ZURN 975XL2 | Howard County | — |
| May 31, 2024 | Commercial Plumbing Addition Alteration Permit | HOWARD COUNTY GENERAL HOSPTIAL/Operating rooms 1-11/ Renovation to upgrade existing integration systems in ORS 1-7 and addition of integration systems to ORS 9- | Howard County | — |
| Mar 22, 2024 | Commercial Plumbing Addition Alteration Permit | BUILDING 13/ JHU APL/ Add two new water heaters and relocate one water heater (WATER HEATERS ARE ELECTRIC) for Ro System; (1) 1.5" Zurn 95 X L2 | Howard County | — |
| Aug 30, 2023 | Commercial Plumbing Addition Alteration Permit | BUILDING 3-125/ JHU APL/Install 1-Kitchen Sink- 1-Coffee Maker- 1-Ice Machine and 1-Backflow Preventer (3/8" Watt LF-7 Coffee Machine) | Howard County | — |
| Aug 26, 2022 | Commercial Plumbing Addition Alteration Permit | 2ND FLOOR/ ASCEND ONE BUILDING/ HOWARD COUNTY DEPARTMENT OF REC & PARKS (PARK RANGERS)/ INSTALL PLUMBING FIXTURES : 1- KITCHEN SINK / 2- REFRIGERATORS | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed7
- Cancelled3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.