Contractor · Electrical

ARMSTRONG ELECTRICAL SERVICES LLC

10 building permits since 2022 in Boulder city, CO and Boulder County, CO — $69,473 in reported job value over 6 permits that state one.

Building permits
10
Reported job value
$69.5K
Active
2022–2026
Latest permit
Mar 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO8
  • Boulder County, CO2

Permits by year

By issue date (application date where there is none).

048
7
202220242026*
* 2026 is year to date.
View as table
YearPermits
20222
20247
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical9
  • Electric meters3
  • Kitchens2
  • Remodels2
  • EV chargers2

Permit types

As the building departments classify them.

  • Electrical Permit7
  • Electrical Service Change2
  • Building Permit - Townhome1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 23, 2026Electrical Service ChangeUpgrade Electrical Service to 200 AMPBoulder County$3,200
Dec 5, 2024Electrical PermitResidential service upgrade from 125 amps to 200 amp service. Replacing meter housing and main electrical panel with 200 amp rated lever bypass and 40/80 circuiBoulder$3,500
Dec 3, 2024Electrical Permit**VOID-Inspections not completed within 180 days** - Install of 125 amp sub panel with main breaker in Garage. - Install of a 240v dedicated circuit with ampaciBoulder$1,500
Nov 22, 2024Electrical PermitVOID DUPLICATE-125 amp sub panel with main breaker - FUTURE 240v 50 amp dedicated circuit for potential EV charger. - *** No Specs available for equipment. CustBoulder—
Nov 19, 2024Electrical PermitVOID DUPLICATE- 100 amp sub panel and feed in Garage - Dedicated 50 amp EV charger in garage - 40 amp 240 v circuit for space heaterBoulder—
Sep 17, 2024Electrical PermitService upgrade/ Replacement. Replace existing Meter with 200 Amp Meter/ Main Combo with lever bypassBoulder—
Sep 17, 2024Electrical Permit*Voided - Duplicate* Service upgrade from 125 amp to 200 amps. - Replace existing meter with 200 Amp meter/main Combo with lever bypassBoulder—
May 8, 2024Electrical Service ChangeConvert Electrical Service from Overhead to Underground and Upgrade to 200AMPBoulder County$3,900

Permit status

Where its permits stand, as the departments report them.

  • Void4
  • Completed2
  • Additional information required2
  • Closed1
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.