Contractor · Electrical

alibrandi, pasquale a

10 building permits since 2009 in Falmouth town, MA; Andover town, MA and Walpole town, MA, across 3 counties.

Building permits
10
Reported job value
—
Active
2009–2021
Latest permit
Mar 31, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA8
  • Andover town, MA1
  • Walpole town, MA1

Permits by year

By issue date (application date where there is none).

012
2
2009201120182021
View as table
YearPermits
20092
20102
20111
20151
20181
20192
20211

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical9
  • Remodels2
  • HVAC1
  • Generators1

Permit types

As the building departments classify them.

  • ELECT.8
  • Building Permit1
  • Electrical Permit RESIDENTIAL One and Two Family1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 31, 2021ELECT.wire office trailer from existing subpanelFalmouth Town—
Sep 20, 2019ELECT.remove & replace 73 existing lighting fixtures with new. installing 16 tel-data dropsFalmouth Town—
Apr 10, 2019ELECT.replace 7 4' fixtures, install 1 temp heat det for 1 week.Falmouth Town—
Feb 2, 2018ELECT.ua#: 2262598 unit 2 - tenant fitout of existing space, step-up transformer for 480v service w/ generator backup.Falmouth Town—
Jan 20, 2015Building PermitINSTALL AND UPGRADE THE FIRE ALARM SYSTEM, INCLUDING A NEW FACP AND DIGITAL DIALER AS PART OF THE COURTYARD INFILL PROJECT.Andover Town—
Apr 11, 2011ELECT.#10 mbl st - rowe lab - install new 200 amp feed to 112.5 kva and reconnect to existing 400 amp feedr from lilly bldgFalmouth Town—
Oct 29, 2010ELECT.#18 mbl street: add various recept, circuits, wiremold &/or disconnect sw for related equip. in the following rooms: xrc # 2 & 3, 612, 670, 107. 153, 207, 160, Falmouth Town—
Mar 25, 2010Electrical Permit RESIDENTIAL One and Two FamilyLOW VOLTAGE CONTROLS IN LAB 271Walpole Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed8
  • Active1
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.