11 building permits since 2018 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2018–2024
Latest permit
Jan 24, 2024

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

024
4
20182020202120222024
View as table
YearPermits
20182
20203
20211
20224
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical4
  • Accessory dwelling units3
  • HVAC2
  • Solar2
  • Bathrooms2
  • Windows & doors2
  • Battery storage1
  • Grading & excavation1
  • Plumbing1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 24, 2024Building**OWNER TO ADDRESS VOIDED PERMIT B-195604, B-181146, B-202493 and B-214702 . NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZESanta Cruz County—
Jun 29, 2022BuildingConstruction Change Document (Change Order) #1 to Permit B-195604 to remove the excavated garage at Level 1, relocate the ADU to a flat area of the site, re-oriSanta Cruz County—
Apr 21, 2022BuildingInstall a new heat [ump and air handler. Tie into existing ducts and registers. Install or verify listed smoke detectors and carbon monoxide alarms or combinatiSanta Cruz County—
Mar 17, 2022BuildingConstruct a new 1,192sq. ft. two story, 2 bedroom, 2 bath ADU with an 880 sq. ft. attached garage, decks and covered patio on site with an existing SFD. InstallSanta Cruz County—
Feb 22, 2022BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install (10kw & 27kwh) ( 2) battery energy storage systSanta Cruz County—
Aug 16, 2021BuildingInstall new mini split unit with associated piping and venting at an existing Single Family Dwelling. Install listed smoke detectors and carbon monoxide alarms Santa Cruz County—
Dec 21, 2020BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(13.9)kW, (32) modules photovoltaicSanta Cruz County—
Jul 29, 2020BuildingSRA-Mod/Scotts Valley Go on line and check the status of your application, correction and approval letters will not be mailed. Install 610sqft of ground mountedSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed6
  • Active4
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.