Contractor · General building
WILLIAM L PUMPHREY PLUMBING & HEATING INC.
11 building permits since 2023 in Howard County, MD.
- Building permits
- 11
- Reported job value
- —
- Active
- 2023–2026
- Latest permit
- May 6, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD11
Permits by year
By issue date (application date where there is none).
02.55
5
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2024 | 3 |
| 2025 | 5 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels11
- Additions11
- Plumbing11
- Gas6
- Bathrooms6
- Kitchens5
Permit types
As the building departments classify them.
- Residential Plumbing Addition Alteration Permit11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 6, 2026 | Residential Plumbing Addition Alteration Permit | SFD/Reconstruct kitchen same location 1-Kitchen sink, 1-disposal, 1-dishwasher and 1-bar sink. Reconnect gas range 1st floor. | Howard County | — |
| Feb 10, 2026 | Residential Plumbing Addition Alteration Permit | SFD/Install gas line to 2 fireplaces. | Howard County | — |
| Jul 22, 2025 | Residential Plumbing Addition Alteration Permit | SFD/Reconstruct kitchen and powder room on 1st floor and add laundry on 2nd floor. Kitchen and pantry 3 sinks and dishwasher, bathroom toilet, lav and shower on | Howard County | — |
| Apr 17, 2025 | Residential Plumbing Addition Alteration Permit | Reconstruct powder room 1-toilet and 1-lav on 1st floor. Reconstruct hall bath 1-toilet, 1-lav and 1-tub on 2nd floor. Install new master bath 1-toilet, 1-lav a | Howard County | — |
| Feb 12, 2025 | Residential Plumbing Addition Alteration Permit | Install new gas line to 1st floor fireplace. | Howard County | — |
| Feb 4, 2025 | Residential Plumbing Addition Alteration Permit | Reconstruct kitchen 1-sink, 1-dishwasher, 1-disposer, 1-instant hot and 1-water line to refrigerator in 1st floor kitchen. | Howard County | — |
| Jan 17, 2025 | Residential Plumbing Addition Alteration Permit | Reconstruct kitchen and install double check on steam line for range and coffee machine. 1st floor. 1-Kitchen sink, 1-dishwasher water line for refrigerator, 1- | Howard County | — |
| Aug 21, 2024 | Residential Plumbing Addition Alteration Permit | Reconstruct gas line to dryer and install sump pump and hose bib. 1st floor of addition. | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Cancelled2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.