Contractor · Electrical

VISION ELECTRIC SRQ LLC

11 building permits since 2022 in Sarasota city, FL and North Port city, FL — $37,485 in reported job value over 11 permits that state one.

Building permits
11
Reported job value
$37.5K
Active
2022–2025
Latest permit
Aug 14, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sarasota city, FL10
  • North Port city, FL1

Permits by year

By issue date (application date where there is none).

01.53
3
2022202320242025
View as table
YearPermits
20223
20232
20243
20253

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical8
  • Electric meters4
  • Gas1
  • Kitchens1
  • Plumbing1
  • Generators1

Permit types

As the building departments classify them.

  • Over the Counter Permit8
  • Building and Zoning2
  • Electric Service Changeout1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 14, 2025Over the Counter PermitCompletion of Fpl underground conversion. Connection of Fpl feeder conduit to existing meter enclosure. Code mandated grounding updated. Connection of Fpl feedeSarasota City$1,829
May 21, 2025Building and ZoningInstall transfer switch with 200amp main breaker for 26Kw Standby Generator. Refeed main panel in garage from transfer switch, install ground bar in panel, and Sarasota City$3,347
Jan 24, 2025Over the Counter PermitService upgrade from 150 amp to 200 amp. Replacement of riser, meter, and panel. Installation of exterior emergency disconnect and surge protection per 2020 codSarasota City$7,210
Dec 2, 2024Over the Counter PermitService replacement. Replacement of meter cabinet with 200amp meter main combo. Replacement of grounding system and garage breaker panel.Sarasota City$6,295
Aug 2, 2024Building and ZoningRelocation of kitchen peninsula outlets and garbage disposal switch. Work is being done in order to accommodate new flat counter top. Currently there is two couSarasota City$1,500
Mar 19, 2024Over the Counter PermitReplacement of two, 16 ft. Parking lot light poles that fell down during a storm. Using existing concrete base and existing mounting bolts. New light fixtures aSarasota City$8,460
Aug 15, 2023Over the Counter PermitReplacement of 150amp challenger panel in the garage. Grounding up update by meter on east side of residence.Sarasota City$3,200
Jan 13, 2023Electric Service ChangeoutINT-ELECTRIC SERVICE CHANGENorth Port City$2,144

Permit status

Where its permits stand, as the departments report them.

  • Closed10
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.