Contractor · Electrical

Village of Monroe

11 building permits since 2018 in Monroe village, NY.

Building permits
11
Reported job value
—
Active
2018–2024
Latest permit
Nov 12, 2024

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Monroe village, NY11

Permits by year

By issue date (application date where there is none).

01.53
3
201820192021202220232024
View as table
YearPermits
20181
20191
20212
20222
20232
20243

Type of work

Permits describing each kind of work; one permit can cover several.

  • Telecom5
  • Generators3
  • Electrical2
  • HVAC1
  • Remodels1

Permit types

As the building departments classify them.

  • Temporary Tent5
  • Cell Tower4
  • Electric Extension or Upgrade1
  • HVAC/Generator1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 12, 2024Temporary TentInstallation of (1) 20' x 40' enclosed tent for assembly purposes. NOTE: 1. Minimum one 5lb fire extinguisher 2. Minimum 44" wide isle required for non fixed seMonroe Village—
Sep 30, 2024Cell TowerInstallation of (3) Commscope antennas, (3) AIR 6472 antennas, (9) RRHS and (3) RHHS. Removal of existing unused equipment. All work as per submitted stamped plMonroe Village—
Apr 29, 2024Electric Extension or UpgradeInstallation of (3) Commscope antennas, one RFS cable and (3) Ericsson Radios. Removal of existing unused equipment. All work as per submitted stamped plans preMonroe Village—
Dec 9, 2023Temporary TentInstallation of 20' x 40' temporary special events tent. REQUIRE ONE 5LBS FIRE EXTIGUISHER WITHIN TENT No inspections documented due to timeframe of when permitMonroe Village—
Aug 25, 2023Temporary TentInstallation of (3) 40' x 40' open sided tents for assembly purposes. NOTE: 1. Minimum one 5lb fire extinguisher per tent 2. Minimum 44" wide isle required for Monroe Village—
Dec 10, 2022Temporary TentErection of 20' x 40' temporary tent meeting section 3103 of the 2020 NYS Fire Code No inspections documented. Due to the restrictions on how long the tent is aMonroe Village—
Aug 17, 2022Cell TowerReplace 3 antennas & 6 RRH's as per submitted stamped plans prepared by Samuel Turkal P.E. and Structural analysis prepared by G Lance Cooke P.E. Final certificMonroe Village—
Jun 16, 2021Cell TowerInstallation of new antenna equipment to replace existing for Verizon section of existing tower as per submitted stamped plans prepared by Adrian Howard Massie Monroe Village—

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Void1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.