Contractor · Specialty (solar, fire, telecom)

Tylon George/Julia Casale

11 building permits since 2022 in Stamford town, CT; New Fairfield town, CT and Bristol town, CT, across 3 counties — $368,382 in reported job value over 11 permits that state one.

Building permits
11
Reported job value
$368.4K
Active
2022–2023
Latest permit
May 22, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stamford town, CT4
  • New Fairfield town, CT2
  • Bristol town, CT1
  • Stonington town, CT1
  • New Milford town, CT1
  • Redding town, CT1
  • Ridgefield town, CT1

Permits by year

By issue date (application date where there is none).

036
6
20222023
View as table
YearPermits
20225
20236

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar11
  • Electrical5

Permit types

As the building departments classify them.

  • Electrical Permit5
  • Building Permit2
  • Solar Permit Application2
  • Solar PV1
  • Stonington Solar Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 22, 2023Electrical PermitINSTALLATION OF ROOF-MOUNTED PV SYSTEM – 8.40KW (21 MODULES) WITH (N)100A LOAD CENTERStamford Town$27,819
May 2, 2023Building PermitINSTALLATION OF ROOF-MOUNTED PV SYSTEM – 8.40KW (21 MODULES) WITH (N)100A LOAD CENTERStamford Town$16,689
Apr 25, 2023Stonington Solar PermitINSTALLATION OF ROOF-MOUNTED PV SYSTEM – 12.80KW (32 MODULES) WITH (N)100A LOAD CENTERStonington Town$55,952
Apr 18, 2023Electrical PermitINSTALLATION OF ROOF-MOUNTED PV SYSTEM – 8.40KW (21 MODULES) WITH (N)100A LOAD CENTERStamford Town$11,128
Feb 7, 2023Solar Permit ApplicationINSTALLATION OF ROOF-MOUNTED PV SYSTEM – 20.93 KW (64 MODULES)New Fairfield Town$16,388
Jan 31, 2023Solar Permit Applicationpv system roof mounted solar panel installNew Fairfield Town$68,000
Dec 12, 2022Solar PVINSTALLATION OF ROOF-MOUNTED PV SYSTEM - 12.40 KW (37 MODULES)Redding Town$60,037
Dec 9, 2022Electrical PermitINSTALLATION OF ROOF-MOUNTED PV SYSTEM - 5.695 KW (17 MODULES)Ridgefield Town$11,332

Permit status

Where its permits stand, as the departments report them.

  • Completed6
  • Active4
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.