Contractor · Plumbing
Thomas Gasparrini
172 building permits since 2013 in Stamford town, CT; Darien town, CT and Ridgefield town, CT, across 2 counties — $20,097,127 in reported job value over 159 permits that state one.
- Building permits
- 172
- Reported job value
- $20.1M
- Active
- 2013–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT159
- Darien town, CT5
- Ridgefield town, CT3
- Weston town, CT2
- Rocky Hill town, CT1
- New Canaan town, CT1
- Wilton town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 3 |
| 2014 | 12 |
| 2015 | 27 |
| 2016 | 19 |
| 2017 | 10 |
| 2018 | 8 |
| 2019 | 14 |
| 2020 | 10 |
| 2021 | 7 |
| 2022 | 12 |
| 2023 | 14 |
| 2024 | 12 |
| 2025 | 15 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing158
- Water heaters79
- Gas38
- Bathrooms38
- HVAC30
- Demolition29
- Electrical6
- Roofing5
- Generators4
- Kitchens3
Permit types
As the building departments classify them.
- Plumbing Permit145
- Mechanical Permit22
- Plumbing2
- Building Permit1
- Gas Permit1
- Plumbing/Gas Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Plumbing Permit | Complete installation of sanitary waste & vent. Complete installation of above domestic water piping. Complete installation of below storm drain piping. Insulat | New Canaan Town | — |
| Oct 26, 2026 | Plumbing Permit | Complete core boring. Install water, waste, and vent piping to accommodate new fixture layout. Insulate water piping. Furnish and install plumbing fixtures and | Darien Town | — |
| Oct 7, 2026 | Plumbing Permit | PARTNER RE PPROJECT Complete all core boring and fire stopping as required. Complete installation of new water, waste, and vent piping. Connect to existing serv | Stamford Town | $117,000 |
| Aug 4, 2026 | Plumbing Permit | Complete installation of new water, waste, and vent piping to accommodate new fixture layout, connect to existing services as required. Complete core boring and | Darien Town | — |
| Aug 4, 2026 | Plumbing Permit | Provide for core boring and fir stopping. Complete installation of water, waste, and vent, for new fixture layout. Furnish and install water meter with remote r | Darien Town | — |
| Jun 11, 2026 | Plumbing Permit | Complete installation of water, waste, and vent piping ato accommodate new fixture layout, connect to existing services as required.Work per plans and specifica | Stamford Town | $97,595 |
| Apr 14, 2026 | Plumbing/Gas Permit | Complete cut, cap, safe off, and drop of all existing plumbing fixtures and associated piping for removal by others. Complete installation of all water, waste, | Wilton Town | $40,170 |
| Mar 18, 2026 | Plumbing Permit | Complete installation of water, waste, and vent piping to serve new core toilet room and flloor drain in mechanical room. | Stamford Town | $106,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed115
- Active54
- Approved2
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.