Contractor · Plumbing

Thomas Gasparrini

172 building permits since 2013 in Stamford town, CT; Darien town, CT and Ridgefield town, CT, across 2 counties — $20,097,127 in reported job value over 159 permits that state one.

Building permits
172
Reported job value
$20.1M
Active
2013–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stamford town, CT159
  • Darien town, CT5
  • Ridgefield town, CT3
  • Weston town, CT2
  • Rocky Hill town, CT1
  • New Canaan town, CT1
  • Wilton town, CT1

Permits by year

By issue date (application date where there is none).

01530
27
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20133
201412
201527
201619
201710
20188
201914
202010
20217
202212
202314
202412
202515
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing158
  • Water heaters79
  • Gas38
  • Bathrooms38
  • HVAC30
  • Demolition29
  • Electrical6
  • Roofing5
  • Generators4
  • Kitchens3

Permit types

As the building departments classify them.

  • Plumbing Permit145
  • Mechanical Permit22
  • Plumbing2
  • Building Permit1
  • Gas Permit1
  • Plumbing/Gas Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026Plumbing PermitComplete installation of sanitary waste & vent. Complete installation of above domestic water piping. Complete installation of below storm drain piping. InsulatNew Canaan Town—
Oct 26, 2026Plumbing PermitComplete core boring. Install water, waste, and vent piping to accommodate new fixture layout. Insulate water piping. Furnish and install plumbing fixtures and Darien Town—
Oct 7, 2026Plumbing PermitPARTNER RE PPROJECT Complete all core boring and fire stopping as required. Complete installation of new water, waste, and vent piping. Connect to existing servStamford Town$117,000
Aug 4, 2026Plumbing PermitComplete installation of new water, waste, and vent piping to accommodate new fixture layout, connect to existing services as required. Complete core boring andDarien Town—
Aug 4, 2026Plumbing PermitProvide for core boring and fir stopping. Complete installation of water, waste, and vent, for new fixture layout. Furnish and install water meter with remote rDarien Town—
Jun 11, 2026Plumbing PermitComplete installation of water, waste, and vent piping ato accommodate new fixture layout, connect to existing services as required.Work per plans and specificaStamford Town$97,595
Apr 14, 2026Plumbing/Gas PermitComplete cut, cap, safe off, and drop of all existing plumbing fixtures and associated piping for removal by others. Complete installation of all water, waste, Wilton Town$40,170
Mar 18, 2026Plumbing PermitComplete installation of water, waste, and vent piping to serve new core toilet room and flloor drain in mechanical room.Stamford Town$106,000

Permit status

Where its permits stand, as the departments report them.

  • Completed115
  • Active54
  • Approved2
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.