Contractor · Roofing

Tema Roofing Services LLC

11 building permits since 2021 in Summit County, OH; Akron city, OH and Tallmadge city, OH, across 2 counties.

Building permits
11
Reported job value
—
Active
2021–2022
Latest permit
Oct 19, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Summit County, OH5
  • Akron city, OH3
  • Tallmadge city, OH2
  • Columbus city, OH1

Permits by year

By issue date (application date where there is none).

0510
10
20212022
View as table
YearPermits
20211
202210

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing8

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 19, 2022BuildingRemove existing BUR roof down to deck. Mechanically attach 2 layers of 2.2" insulation. Adhere 60mil black EPDM membrane roofing system.Akron City—
Oct 19, 2022BuildingRemove existing BUR roof down to deck. Mechanically attach 2 layers of 2.2" insulation. Adhere 60mil black EPDM membrane roofing system.Summit County—
Jul 18, 2022BuildingRemove the existing roof system to the deck. Mechanically attach 2 layers of 2.2" insulation. Adhere 60 mil black EPDM membrane roofing system. Install perimeteSummit County—
Jul 18, 2022BuildingRemove the existing roof system to the deck. Mechanically attach 2 layers of 2.2" insulation. Adhere 60 mil black EPDM membrane roofing system. Install perimeteAkron City—
Jun 14, 2022BuildingRemove the existing roof to the deck. Mechanically attach R-25 Insulation 2 layers of 2.2" and adhere 60 mil EPDMAkron City—
Jun 14, 2022BuildingRemove the existing roof to the deck. Mechanically attach R-25 Insulation 2 layers of 2.2" and adhere 60 mil EPDMSummit County—
May 17, 2022BuildingCut the existing membrane. Inspect the existing 3" insulation. Replace any wet insulation. Mechanically attach 1" insulation. Mechanically attach 60 mil EPDM. FSummit County—
May 17, 2022BuildingCut the existing membrane. Inspect the existing 3" insulation. Replace any wet insulation. Mechanically attach 1" insulation. Mechanically attach 60 mil EPDM. FTallmadge City—

Permit status

Where its permits stand, as the departments report them.

  • Issued8
  • Approved2
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.