Contractor · General building
Syno Tell
11 building permits since 2016 in Westford town, MA; Methuen city, MA and Gloucester city, MA, across 2 counties — $266,750 in reported job value over 4 permits that state one.
- Building permits
- 11
- Reported job value
- $266.8K
- Active
- 2016–2026
- Latest permit
- Mar 31, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Westford town, MA5
- Methuen city, MA3
- Gloucester city, MA1
- Haverhill city, MA1
- Peabody city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2017 | 1 |
| 2018 | 1 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical8
- Kitchens4
- Remodels4
- Bathrooms4
- Roofing1
- Additions1
- Windows & doors1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical Permit7
- Building Permit1
- Building Permit Application: One or Two Family1
- Electrical Permit - RESIDENTIAL ONLY1
- Residential Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 31, 2026 | Building Permit Application: One or Two Family | 1st Floor - Kitchen addition (same footprint) and Sunroom remodel (uncondtioned) per plan 2nd Floor - Add Master Bathroom and add Dormer in Master Bedroom per p | Peabody City | $150,000 |
| Nov 6, 2025 | Electrical Permit - RESIDENTIAL ONLY | Replace two 100 amp Pushmatic Main Panels in a two family dwelling. | Haverhill City | — |
| Mar 3, 2025 | Electrical Permit | Remodel 3/4 Bathroom 1st Floor New bathroom 2nd Floor Ceiling recess light thru out dwelling Kitchen Remodel | Gloucester City | $104,000 |
| Jan 10, 2025 | Building Permit | Renovation two existing bathrooms (first floor and basement) new kitchen, garage door, replace two exterior doors and reroof. Opening 12ft wall between the kitc | Methuen Town City | — |
| Dec 26, 2024 | Electrical Permit | 3 Bathroom Remodel Kitchen Remodel Adding a Bedroom in Attic | Methuen Town City | $12,000 |
| Jun 6, 2024 | Electrical Permit | Vinyl Siding installation permit to detach and reattach exterior lights and meter. | Methuen Town City | $750 |
| Nov 8, 2023 | Residential Permit | — | Westford Town | — |
| Oct 23, 2018 | Electrical Permit | — | Westford Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed4
- Issued3
- Active2
- Closed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.