Contractor · Specialty (solar, fire, telecom)

SOLAR TECH ENERGY SYSTEMS INC

1,465 building permits since 2017 in San Diego County, CA; Oceanside city, CA and Riverside County, CA, across 18 counties — $1,266,472 in reported job value over 35 permits that state one.

Building permits
1,465
Reported job value
$1.3M
Active
2017–2026
Latest permit
Sep 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA1K
  • Oceanside city, CA156
  • Riverside County, CA44
  • Los Angeles city, CA31
  • Temecula city, CA27
  • San Diego city, CA22
  • Vista city, CA16
  • Downey city, CA13
  • Anaheim city, CA11
  • Riverside city, CA9

Permits by year

By issue date (application date where there is none).

0150300
259
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201764
2018171
2019237
2020189
2021177
202287
2023259
20249
202524
2026 (YTD)245

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar1.3K
  • Electrical342
  • Battery storage280
  • Roofing46
  • Electric meters14
  • EV chargers3
  • Plumbing2
  • Water heaters2
  • Accessory dwelling units1
  • Additions1

Permit types

As the building departments classify them.

  • Electrical221
  • Existing64
  • BLD SOLAR PV RES59
  • SFD SOLAR PV - SIMPLE53
  • BLDG - Building (R)22
  • Building Misc - Photovoltaic System (PV)14
  • Residential10
  • SFD SOLAR APP PLUS WITH ESS9

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 29, 2026ONLINE SOLAR APP PERMITSOLAR APP A - ROOF MOUNTED SOLAR & ESSElk Grove City$27,000
Sep 28, 2026—Photovoltaic System With Micro-inverters Install Residential Roof Mounted Solar System With (24) Modules, (24) Micro-invertersAnaheim City—
Sep 24, 2026—INSTALL (N) ROOF MOUNTED PVS 7.74KW, (18) PANELS, (N) 125A LOAD CENTER, AND 27.0KWH ENERGY STORAGE SYS TO (E) PVS FOR MAIN HOUSEGarden Grove City$55,000
Sep 23, 2026Permit Name:—Escondido City—
Sep 21, 2026BLD SOLAR PV RESROOF MOUNTED PV WITH ESS, 6.6 KW, 15 PV PANELS, 1 TESLA BATTOceanside City—
Sep 17, 2026Single FamilyReviewed by SolarApp+ 5.3kw Solar PV System, 27 kw PV Storage System Size and nullgal Solar WH System (water heater installed null).Sacramento$22,000
Aug 27, 2026RESIDENTIAL—Marin County$2,500
Aug 19, 2026ONLINE SOLAR APP PERMITNGUYEN - PV + ESS-SOLAR APP AElk Grove City$34,000

Permit status

Where its permits stand, as the departments report them.

  • Completed425
  • Active411
  • Issued323
  • Finaled246
  • Not stated35
  • Closed10
  • Expired7
  • Approved3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.