Contractor · Electrical

SQUARE ONE ELECTRIC LLC

11 building permits since 2025 in Bartlett city, TN and Collierville town, TN.

Building permits
11
Reported job value
—
Active
2025–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bartlett city, TN6
  • Collierville town, TN5

Permits by year

By issue date (application date where there is none).

0510
10
20252026*
* 2026 is year to date.
View as table
YearPermits
20251
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • EV chargers4
  • Additions2
  • Electric meters2
  • Kitchens1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026ElectricalWire to add one lighting outlet fed from one new switch for new closet addition; install new wiring to add new smoke/CO detectors. Previous permit expired, resuBartlett City—
Sep 24, 2026ElectricalReplace outlets and switches throughout home (purple wire nuts and alumiconn connectors with copper pigtails to devices), aluminum wiring, replace panel and feeCollierville Town—
Jul 3, 2026ElectricalInstall 50 amp 240 volt circuit to new EV rated receptacle in garageCollierville Town—
Jul 3, 2026ElectricalAdd new 50 amp 240 volt circuit to customer furnished Tesla wall connector (EV charger)Collierville Town—
Jun 17, 2026ElectricalReplace service with 200 amp panel and new meter socket removing existing fuse panel inside home; run new circuits to kitchen, washer & dryer, replacing switcheCollierville Town—
Jun 17, 2026ElectricalInstall 40 amp 240 volt circuit to customer provided EV charger (Tesla Wall Connector)Collierville Town—
May 14, 2026ElectricalReplace electrical panelBartlett City—
May 5, 2026ElectricalInstall new 60 amp 240 volt circuit for EV charger. Load calculation attached to this application which includes the EV charger load. Also attached is current lBartlett City—

Permit status

Where its permits stand, as the departments report them.

  • Closed4
  • Completed4
  • Issued1
  • Expired1
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.