Contractor · HVAC
sheehan, francis s
11 building permits since 2013 in Falmouth town, MA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2013–2016
- Latest permit
- Jan 8, 2016
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA11
Permits by year
By issue date (application date where there is none).
048
7
2013201420152016
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2014 | 1 |
| 2015 | 7 |
| 2016 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC4
- Roofing2
- Bathrooms2
- Windows & doors2
- Battery storage1
Permit types
As the building departments classify them.
- RESI.11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 8, 2016 | RESI. | air sealing attic and kneewalls. 390 sq ft 2'' fsk board to kneewall, 60 sq ft, 2'' fsk board to walls. | Falmouth Town | — |
| Jan 8, 2016 | RESI. | 968 sq ft r 30 unrestricted cellulose to attic. 143 sq ft r 30 unrestricted cellulose to attic. 240 sq ft r 19 fiberglass to basement. | Falmouth Town | — |
| Oct 29, 2015 | RESI. | weatherization, 1188 sq ft r 30 cellulose to attic. 612 sq ft r 19 fiberglass to basement. 576 sq ft r 19 fiberglass to crawl. 32 sq ft 2'' tmax board to bulkhe | Falmouth Town | — |
| Sep 30, 2015 | RESI. | install 466 s.f. r18-20 cellulose to attic. 132 r-30 cellulose to attic. 960 sf t max to basement perimeter. 180 s.f. tmax to kneewall. | Falmouth Town | — |
| Aug 26, 2015 | RESI. | weatherization: 480 sqft r18-20 cellulose to attic - 224 sqft 2'' tmax foam to basement | Falmouth Town | — |
| Aug 26, 2015 | RESI. | weatherization: 120 sqft r52 cellulose to attic flat | Falmouth Town | — |
| Jun 10, 2015 | RESI. | seal ductwork in basement - weather strip two exterior doors - r30 cellulose insulation to 672 sqft of attic floor - vent chutes in attic rafter bays- r19 fiber | Falmouth Town | — |
| Jun 3, 2015 | RESI. | install r 12 cellulose to 320 sq ft of floored attic area. r 20 cellulose to 872 sq ft of open attic floor. insulated pull down attic stair cover, vent chutes i | Falmouth Town | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.