Contractor · Electrical

SAN MARCOS ELECTRICAL SVC

11 building permits since 2023 in Vista city, CA; San Diego County, CA and Oceanside city, CA — $4,850 in reported job value over 1 permits that state one.

Building permits
11
Reported job value
$4.9K
Active
2023–2026
Latest permit
May 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Vista city, CA5
  • San Diego County, CA4
  • Oceanside city, CA1
  • San Diego city, CA1

Permits by year

By issue date (application date where there is none).

048
8
202320252026*
* 2026 is year to date.
View as table
YearPermits
20238
20251
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar7
  • Electrical5
  • Battery storage2
  • Electric meters2

Permit types

As the building departments classify them.

  • Building Misc - Photovoltaic System (PV)3
  • BLD SOLAR PV RES1
  • Building Misc - Electric Meter Upgrade1
  • Building Misc - Misc Electrical1
  • Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 27, 2026Building Misc - Misc ElectricalINSTALL DOUBLE BOXES IN 18 EXISTING OUTLETSVista City$4,850
Mar 6, 2026Electrical—San Diego City—
Nov 17, 2025Building Misc - Electric Meter Upgrade200 AMP ELECTRIC PANEL UPGRADEVista City—
Jun 15, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any exiSan Diego County—
May 10, 2023BLD SOLAR PV RES7.57kW ROOF MOUNTED PV SYS. 17 MODULES, 1 INVERTEROceanside City—
Mar 14, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any exiSan Diego County—
Mar 10, 2023Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEMVista City—
Mar 10, 2023Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEMVista City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled7
  • Active2
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.