Contractor · HVAC
sadrack lorrius
11 building permits since 2014 in Falmouth town, MA; Lynnfield town, MA and Abington town, MA, across 5 counties — $183,000 in reported job value over 8 permits that state one.
- Building permits
- 11
- Reported job value
- $183K
- Active
- 2014–2025
- Latest permit
- Jun 3, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA2
- Lynnfield town, MA2
- Abington town, MA2
- Somerville city, MA1
- Canton town, MA1
- Sharon town, MA1
- Stoughton town, MA1
- Middleborough town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2018 | 1 |
| 2019 | 2 |
| 2022 | 1 |
| 2023 | 2 |
| 2024 | 3 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC8
- Gas2
- Remodels2
- Roofing2
- Pools & hot tubs1
Permit types
As the building departments classify them.
- SHT MTL2
- Alteration/Renovation1
- Building Permit1
- Building Permit Application1
- Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)1
- HVAC1
- Mechanical Permit Application1
- Sheet Metal Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 3, 2025 | Sht Mtl_Mech | replace gas furnace coil and condenser, add ducting per manual D report | Stoughton Town | $5,000 |
| Aug 28, 2024 | Mechanical Permit Application | INSTALL NEW DUCTWORK FOR 4 NEW ROOF TOPS UNIT AND REPAIRS DUCTWORK FOR 2 EXISTING ROOF TOPS UNIT INSIDE THE CHURCH | Abington Town | $47,500 |
| Aug 26, 2024 | Building Permit Application | SHEET METAL Install new ductwork for 4 new roof tops unit and repairs ductwork for 2 existng roof tops unit indide the church | Abington Town | $47,500 |
| Jan 24, 2024 | SHT MTL | install a flue exhaust on a tube heater | Falmouth Town | — |
| Apr 6, 2023 | Sheet Metal Permit | — | Middleborough Town | — |
| Feb 16, 2023 | SHT MTL | 1 in basement for first floor and 1 in attic for second floor 80,000 btu 96% single stage 2 1/2 coil and 2 1/2 condensor 16seer | Falmouth Town | — |
| Sep 23, 2022 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Remove existing forced hot air, oil furnace and install high efficiency gas furnace and 3 ton coil and 3 ton condensor. Seal and wrap duct work. | Sharon Town | $10,000 |
| Nov 10, 2019 | Alteration/Renovation | DUCT WORK AND EQUIPMENT FOR NEW HVAC SYSTEM FOR HOME RENOVATION | Lynnfield Town | $17,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued4
- Closed3
- Completed2
- Active1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.