Contractor · Electrical
RUSSELL PATRICIA ANNE
11 building permits since 2014 in Santa Cruz County, CA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2014–2026
- Latest permit
- Oct 5, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA11
Permits by year
By issue date (application date where there is none).
048
7
20142017201920232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2017 | 1 |
| 2019 | 1 |
| 2023 | 1 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar4
- Electrical4
- Roofing2
- Gas1
- HVAC1
- Battery storage1
- Remodels1
- Additions1
- Bathrooms1
- Plumbing1
Permit types
As the building departments classify them.
- Building11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 5, 2026 | Building | Construction of a (N) 120 SF uncovered deck. Verify and/or install listed smoke and carbon monoxide alarms, or combination alarms, throughout the existing dwell | Santa Cruz County | — |
| Jul 3, 2026 | Building | Note state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or b | Santa Cruz County | — |
| Jul 1, 2026 | Building | Removal and re-installation of existing PV system permitted under approved permit B-174454. Re-installation must be completed by a licensed PV installer, per th | Santa Cruz County | — |
| Jun 30, 2026 | Building | Interior remodel of (2) bathrooms at existing SFD. Remodel consists of plumbing, electrical, and fixture upgrades with NO structural alterations. Replace toilet | Santa Cruz County | — |
| Jun 18, 2026 | Building | Siding permit to replace exterior siding/stucco and trim at an existing structure. NOTE: For stucco applications, Santa Cruz County is a marine climate. In addi | Santa Cruz County | — |
| Jun 15, 2026 | Building | Note state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure <600 sq ft, install new sheathing as required with class-B or b | Santa Cruz County | — |
| May 21, 2026 | Building | **OWNER TO ADDRESS VOIDED PERMIT B-236867. NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZED AND CLEARED.** (05/26/26 RESOLVE | Santa Cruz County | — |
| Oct 24, 2023 | Building | Installation of a new 13.5kWh Tesla Powerwall-2 energy storage unit with (1) Tesla Gateway controller at an existing SFD. Install or verify listed smoke detecto | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed6
- Active3
- Not stated1
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.