11 building permits since 2014 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2014–2026
Latest permit
Oct 5, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

048
7
20142017201920232026*
* 2026 is year to date.
View as table
YearPermits
20141
20171
20191
20231
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar4
  • Electrical4
  • Roofing2
  • Gas1
  • HVAC1
  • Battery storage1
  • Remodels1
  • Additions1
  • Bathrooms1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 5, 2026BuildingConstruction of a (N) 120 SF uncovered deck. Verify and/or install listed smoke and carbon monoxide alarms, or combination alarms, throughout the existing dwellSanta Cruz County—
Jul 3, 2026BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Jul 1, 2026BuildingRemoval and re-installation of existing PV system permitted under approved permit B-174454. Re-installation must be completed by a licensed PV installer, per thSanta Cruz County—
Jun 30, 2026BuildingInterior remodel of (2) bathrooms at existing SFD. Remodel consists of plumbing, electrical, and fixture upgrades with NO structural alterations. Replace toiletSanta Cruz County—
Jun 18, 2026BuildingSiding permit to replace exterior siding/stucco and trim at an existing structure. NOTE: For stucco applications, Santa Cruz County is a marine climate. In addiSanta Cruz County—
Jun 15, 2026BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure <600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
May 21, 2026Building**OWNER TO ADDRESS VOIDED PERMIT B-236867. NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZED AND CLEARED.** (05/26/26 RESOLVESanta Cruz County—
Oct 24, 2023BuildingInstallation of a new 13.5kWh Tesla Powerwall-2 energy storage unit with (1) Tesla Gateway controller at an existing SFD. Install or verify listed smoke detectoSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed6
  • Active3
  • Not stated1
  • Pending payment1