Contractor · Electrical

ROWLAND CELIA ELAINE

11 building permits since 2014 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2014–2023
Latest permit
Nov 8, 2023

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

01.53
3
20142015201620212023
View as table
YearPermits
20143
20152
20161
20211
20233

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical4
  • Solar3
  • Battery storage2
  • Bathrooms2
  • Accessory dwelling units1
  • Gas1
  • HVAC1
  • Kitchens1
  • Remodels1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 8, 2023BuildingWindow/door permit to replace in-kind 11-20 windows or doors at an existing habitable structure. Bedroom windows need 5.7 sq ft minimum net clear opening. ReferSanta Cruz County—
Aug 8, 2023BuildingConstruction Change Document #1 to Permit B-232176 to include the following : Updated plans to show the correct location of the battery.Santa Cruz County—
Mar 22, 2023BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install an additional roof mount(5.070)kW, (8) modules Santa Cruz County—
Aug 17, 2021BuildingConvert an existing detached non-habitable workshop that already has water and a bathroom into a new 480 sq. ft. ADU with a 159 sq. ft. loft. To include a new wSanta Cruz County—
Jul 26, 2016BuildingRemodel to an existing detached storage structure to include creating a loft with stairs.(159 sq. ft.) on site with an existing Single Family Dwelling.Santa Cruz County—
Oct 1, 2015BuildingInstall a roof mounted photovoltaic electrical system not to exceed 32 feet in height on a single family dwelling. The Building Inspector may require roof strucSanta Cruz County—
Aug 12, 2015BuildingPERMIT SURRENDERED BY PO 09/10/2015 Central Fire (SRA-mod) Install a roof-mount 8.32kw soalr photovoltaic electrical system at an existing 1-story SFD not to exSanta Cruz County—
Jul 22, 2014BuildingChange Order to B-141803 to add 1/2 Bath & light support beam.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.