Contractor · Electrical
SOLAR OPTIMUM DESIGN & ELECTRICAL
1,470 building permits since 2013 in Los Angeles city, CA; San Diego County, CA and Burbank city, CA, across 11 counties — $1,739,902 in reported job value over 88 permits that state one.
- Building permits
- 1,470
- Reported job value
- $1.7M
- Active
- 2013–2026
- Latest permit
- Sep 23, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA1.2K
- San Diego County, CA86
- Burbank city, CA53
- Oceanside city, CA47
- Riverside city, CA45
- Santa Cruz city, CA13
- Temecula city, CA12
- Anaheim city, CA7
- Elk Grove city, CA7
- Scotts Valley city, CA6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 6 |
| 2014 | 20 |
| 2015 | 44 |
| 2016 | 24 |
| 2017 | 52 |
| 2018 | 98 |
| 2019 | 214 |
| 2020 | 145 |
| 2021 | 106 |
| 2022 | 521 |
| 2023 | 194 |
| 2024 | 19 |
| 2025 | 9 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical1.3K
- Solar463
- Battery storage69
- Roofing41
- EV chargers9
- Electric meters9
- New construction5
- Additions4
Permit types
As the building departments classify them.
- Electrical1.2K
- Residential45
- SFD SOLAR PV - SIMPLE24
- Bldg-Alter/Repair13
- PV & ES Systems13
- SFD SOLAR PV - PANEL UPGRADE12
- Electrical Service9
- BLDG - Building (R)8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 23, 2026 | SolarAPP+ Solar Permit | INSTALL 12 PV PANELS | 5.52KW | (1) TESLA POWERWALL 3 | 125A SUB PANEL | Benicia City | $18,000 |
| Sep 9, 2026 | Residential | INSTALL PV SOLAR SYSTEM WITH (6) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 2.61 KW | Riverside City | $8,000 |
| Jun 23, 2026 | SFD SOLAR APP PLUS WITH ESS | INSTALL 14 PV PANELS | 6.16KW | (1) BATTERY + EXPANSION UNIT | Oceanside City | — |
| Jun 17, 2026 | — | Solar Roof-Mount Over 15kW | Tuolumne County | $40,000 |
| Jun 8, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 10.12KW, (22) PANELS, AND 13.5KWH ENERGY STORAGE SYS FOR MAIN HOUSE | Garden Grove City | $26,000 |
| Mar 10, 2026 | Residential | INSTALL NEW 125A SUB PANEL | Riverside City | $500 |
| Mar 4, 2026 | Residential | **REVISED 4/30/26 - INSTALL PV SOLAR SYSTEM WITH (9) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 3.96 KW, (1) ENERGY STORAGE SYSTEM / MS INSTALL PV SOLAR SYSTEM W | Riverside City | $26,000 |
| Feb 13, 2026 | Electrical | Add 14 pv modules 6.09kw; install 1 ess unit | Mill Valley City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated1.2K
- Finaled114
- Issued59
- Completed49
- Active45
- Expired8
- Closed7
- Withdrawn3
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- SOLAR OPTIMUM DESIGN AND AMP ELECTRICAL
- SOLAR OPTIMUM INC DBA SOLAR OPTIMUM DESIGN AND ELECTRICAL
- SOLAR OPTIMUM DESIGN AND ELECTRI
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.