Contractor · Specialty (solar, fire, telecom)

RILLERA ZOSIMA S

11 building permits since 2013 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2013–2025
Latest permit
Aug 27, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

02.55
5
20132019202320242025
View as table
YearPermits
20132
20191
20232
20241
20255

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar7
  • Electrical3
  • Battery storage2
  • Roofing2
  • Bathrooms1
  • Plumbing1
  • Windows & doors1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 27, 2025BuildingRemoval and re-installation of existing PV system permitted under approved permit B-134043 . Re-installation must be completed by a licensed PV installer, per tSanta Cruz County—
Aug 25, 2025BuildingPajaro Valley FPD / LRA Non-Wildland(Unzoned) Note state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, instaSanta Cruz County—
Jul 24, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Apr 23, 2025BuildingSolarAPP+ Approval ID: SA20250423-3577-68-7-A Install a roof mount 6.97kW, 17 modules, 1 central inverter(s), photovoltaic electrical system not to exceed 32 feSanta Cruz County—
Feb 4, 2025BuildingPAJARO/LRA Replace existing shower/tub with a walk-in tub within an existing bathroom in an existing SFD. Verify and/or install listed smoke and carbon monoxideSanta Cruz County—
Jun 19, 2024BuildingReplace water heater with associated piping and venting at an existing at an existing structure. Install minimum 1.5”m piping insulation for the first 5 feet ofSanta Cruz County—
Jun 6, 2023Building6 month extension to issued building permit B-193813 to 12/06/2023Santa Cruz County—
May 16, 2023BuildingReplace-in-kind (3) standard windows and (1) entry doors at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smoke and Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Active1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.