Contractor · Demolition & excavation

RICKY CAN BUILD IT LLC

11 building permits since 2021 in Arlington County, VA; Hampton city, VA and Salem city, VA, across 3 counties — $259,043 in reported job value over 2 permits that state one.

Building permits
11
Reported job value
$259K
Active
2021–2026
Latest permit
Jan 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA9
  • Hampton city, VA1
  • Salem city, VA1

Permits by year

By issue date (application date where there is none).

024
4
2021202220232026*
* 2026 is year to date.
View as table
YearPermits
20211
20223
20234
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing3
  • Demolition3
  • Electrical3
  • New construction3
  • Gas2
  • Grading & excavation2
  • HVAC1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Electrical3
  • Plumbing3
  • Building1
  • Demolition1
  • Excavation ROW1
  • Mechanical1
  • Transportation ROW - with excavation1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 27, 2026Electrical*Replace/New Electric Fixtures and Appliances Throughout The House.Arlington County—
Jan 15, 2026Plumbing*Replace/New Plumbing and Gas Fixtures and Appliances Throughout The HouseArlington County—
Jan 7, 2026BuildingInstall an Auto Divert to Aisle (ADTA) system and part of Amazon’s ADTA program: Reinstall at DOR3 and Anchor Power drop for MCP Data Drops Pneumatic air drop fHampton City$250,000
Jul 19, 2023Excavation ROWDemo sidewalk and apron for driveway based on Approved LDA plansArlington County—
Jul 19, 2023Transportation ROW - with excavationDemo apron and sidewalk per LDA plans for address 5828 Little Falls RD and 5832 Little falls rd. Install new apron and sidewalk for each property per LDA plansArlington County—
Feb 9, 2023ElectricalFull electrical for new SFDArlington County—
Feb 2, 2023MechanicalHVAC for new SFDArlington County—
Nov 21, 2022PlumbingPlumbing and Gas for new SFDArlington County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled6
  • Closed2
  • Issued1
  • Expired1
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.