Contractor · Electrical
Richard Bird
11 building permits since 2017 in Enfield town, CT; Glastonbury town, CT and Rocky Hill town, CT, across 4 counties — $540,000 in reported job value over 8 permits that state one.
- Building permits
- 11
- Reported job value
- $540K
- Active
- 2017–2025
- Latest permit
- Oct 29, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Enfield town, CT4
- Glastonbury town, CT3
- Rocky Hill town, CT1
- Norwich town, CT1
- Falmouth town, MA1
- Great Barrington town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 4 |
| 2024 | 2 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical9
- HVAC3
- Remodels3
- Heat pumps3
- Demolition2
- Electric meters2
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit6
- Electrical Permit General3
- COMM.1
- RESI1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2025 | Electrical Permit | Provide electrical materials and labor to replace existing 100-amp service entrance cable, meter socket and add required ground rods. Existing 100-amp electrica | Enfield Town | $3,000 |
| Jul 14, 2025 | Electrical Permit General | Electrical upgrades consisting of the relocation of electrical wiring for demolition and electrical wiring new offices reconfiguration. Installation of a new du | Glastonbury Town | $63,000 |
| Aug 1, 2024 | Electrical Permit | Provide electrical materials and labor for the H.H.C. HVI and Digestive Health Suite Fitout project as per the drawings submitted under building permit B24-527. | Enfield Town | $255,000 |
| Jun 13, 2024 | Electrical Permit General | Provide electrical materials and labor for electrical renovations to Glastonbury Arts as per the following: ART STUDIO EXPANSION Electrical demolition for wall | Glastonbury Town | $17,000 |
| Dec 11, 2023 | Electrical Permit | Provide electrical materials and labor to install feeder for new 8-ton heat pump unit installed under permit MP-23-262 | Rocky Hill Town | — |
| Nov 28, 2023 | COMM. | renovation of community health center of cape cod. | Falmouth Town | — |
| Jul 6, 2023 | Electrical Permit | Provide misc material and labor for light fixture upgardes at the Big Y supermarket. W all mounted light fixtures under the Main and Bottle Return Atrium that b | Enfield Town | $102,000 |
| Jan 4, 2023 | Electrical Permit General | Provide electrical materials and labor to install (1) 100-amp 120/208-volt 3-phase 4-wire panel fed from existing module meter enclosure unit #13. Install (2) 1 | Glastonbury Town | $5,000 |
Permit status
Where its permits stand, as the departments report them.
- Active6
- Completed4
- Closed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.