Contractor · Electrical

REASONABLY ACCEPTABLE ELECTRIC

11 building permits since 2022 in Eugene city, OR.

Building permits
11
Reported job value
—
Active
2022–2026
Latest permit
Feb 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Eugene city, OR11

Permits by year

By issue date (application date where there is none).

02.55
5
2022202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20244
20255
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Pools & hot tubs2
  • Accessory dwelling units1
  • HVAC1
  • Generators1
  • Heat pumps1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 11, 2026ElectricalRepairs from water damage, add to existing circuits.Eugene—
Nov 20, 2025ElectricalInstall subpanel and 2 branch circuits to accomodate future heat pump and RV receptacles.Eugene—
May 20, 2025ElectricalInstallation of 50a circuit with GFCI disconnect for future hot tubEugene—
May 7, 2025ElectricalWiring of ADU to code (200amp + 6 branch circuits). Unit panel will be a subpanel of existing main.Eugene—
May 5, 2025Electrical4 pack 400 amp meter bank causing problems. Needs replacement for possible arcing in bussing.Eugene—
Apr 30, 2025Electrical1 branch circuit for hot tub circuitEugene—
Dec 29, 2024Electricalreplace existing main panel and mast with new equivalent compliant with current code.Eugene—
Dec 12, 2024ElectricalInstallation of optional generator system for Oaktree Residential Living.Eugene—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.