Contractor · Pools & outdoor
Quality Pools LLC
11 building permits since 2002 in Minneapolis city, MN and Blaine city, MN, across 2 counties — $1,329,893 in reported job value over 8 permits that state one.
- Building permits
- 11
- Reported job value
- $1.3M
- Active
- 2002–2022
- Latest permit
- Aug 1, 2022
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN8
- Blaine city, MN3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2002 | 1 |
| 2013 | 1 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 1 |
| 2022 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Pools & hot tubs10
- HVAC1
- Remodels1
- Windows & doors1
- New construction1
Permit types
As the building departments classify them.
- Commercial7
- BLDG - Commercial1
- BLDG - Residential1
- BUILDING1
- Res1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 1, 2022 | Res | IN GROUND SWIMMING POOL (MAA) | Minneapolis City | $139,253 |
| Feb 24, 2022 | Commercial | construct raised pool/spa on 4th floor amenity level. | Minneapolis City | $229,640 |
| May 28, 2020 | Commercial | ADDING SWIMMING POOL AND HOT TUB TO APARTMENT BUILDING. ALL STEPS INSIDE POOL TO BE UNIFORM HEIGHT. POOL USES A LIFT FOR ADA ACCESS. HOT TUB TO USE TRANSFER WAL | Minneapolis City | $230,000 |
| May 22, 2019 | Commercial | ADDING NEW HOT TUB. NEW TUB TO BE PLACED IN OLD LOCATION. NEW TUB IS STAINLESS STEEL AND FITS INSIDE CONCRETE OLD TUB. ENGINEER: JODY DAHMS #41461 (JJL) | Minneapolis City | $78,000 |
| Mar 21, 2019 | Commercial | PERMIT IS FOR POOL CONSTRUCTION ON THE 17TH FLOOR. BUILDING DESIGNED BY BKV AND ODEH ENGINEERING. SHOTCRETE POOL WALLS WITH #4 REBAR 6"OC EW PER POOL DRAWINGS. | Minneapolis City | $135,000 |
| Dec 6, 2018 | Commercial | INSTALLATION OF SPA POOL AT SECOND FLOOR (OUTDOOR) OF APTS UNDER CONSTRUCTED UNDER SEPARATE PERMIT (JAG)*** CONSTRUCTION STRUCTURAL LOADS/DETAILS TO BE COORDINA | Minneapolis City | $100,000 |
| Dec 6, 2018 | Commercial | INSTALLATION OF SPA POOL ON 7TH FLOOR OF NEW STRUCTURE UNDER SEPARATE PERMIT (JAG) BUILDING STRUCTURE UNDER BLDG 718041 TO BE COORDINATED WITH POOL CONSTRUCTION | Minneapolis City | $118,000 |
| Oct 16, 2017 | Commercial | INSTALL NEW 13'x32' POOL AND APPROX. 17'x13' SPA AT 7TH FLOOR ROOFTOP AND APPROX. 8'x9' SPA AT 26TH FLOOR ROOFTOP - HUB APARTMENT BUILDING. (LAH) ENGINEER: JODY | Minneapolis City | $300,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed7
- Finaled2
- Expired1
- Not stated1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.