Contractor · Electrical

PREMO & TORRES SOLAR ELECTRIC JV

11 building permits since 2025 in Monterey County, CA; Salinas city, CA and Sacramento County, CA, across 3 counties — $582,660 in reported job value over 6 permits that state one.

Building permits
11
Reported job value
$582.7K
Active
2025–2026
Latest permit
Mar 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Monterey County, CA5
  • Salinas city, CA4
  • Sacramento County, CA1
  • Scotts Valley city, CA1

Permits by year

By issue date (application date where there is none).

0510
9
20252026*
* 2026 is year to date.
View as table
YearPermits
20252
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • Solar8
  • Battery storage1

Permit types

As the building departments classify them.

  • Electrical9
  • CBNC1
  • Residential PV Solar ONLY1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 24, 2026ElectricalResidential roof mounted photovoltaic system. 3.52 kw 8 panels. Existing electrical panel will be used. 200 ampsMonterey County$35,000
Mar 14, 2026ElectricalRev to s26-0006- install add'l (n) 200amp msp & enclosureSalinas City—
Mar 12, 2026ElectricalResidential roof mounted photovoltaic system. 2.64 kw 6 panels. Existing electrical panel will be used. 200 amps related to permit 23cp02978 to be installed on Monterey County$35,000
Mar 12, 2026ElectricalResidential ground mounted photovoltaic system. 10.56 kw 24 panels, new 100 amp combiner sub panel. Existing electrical panel will be used. 400 ampsMonterey County$35,000
Mar 10, 2026ElectricalResidential ground mounted photovoltaic system. 10.56 kw 24 panels. Existing electrical panel will be used. 400 ampsMonterey County—
Feb 17, 2026Electrical2.3kw- 4 module roof mount pvSalinas City—
Feb 5, 2026ElectricalInstall two (2) franklin batteries 15kwh per ess to existing photovoltaic system. Using existing main service panel.Monterey County$37,660
Jan 26, 2026Electrical11.04kw-24 modules- 1 enphase energy ess 10kwhSalinas City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled6
  • Active2
  • Not stated1
  • Completed1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.