Contractor · Electrical
PREMO & TORRES SOLAR ELECTRIC JV
11 building permits since 2025 in Monterey County, CA; Salinas city, CA and Sacramento County, CA, across 3 counties — $582,660 in reported job value over 6 permits that state one.
- Building permits
- 11
- Reported job value
- $582.7K
- Active
- 2025–2026
- Latest permit
- Mar 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Monterey County, CA5
- Salinas city, CA4
- Sacramento County, CA1
- Scotts Valley city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 2 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Solar8
- Battery storage1
Permit types
As the building departments classify them.
- Electrical9
- CBNC1
- Residential PV Solar ONLY1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 24, 2026 | Electrical | Residential roof mounted photovoltaic system. 3.52 kw 8 panels. Existing electrical panel will be used. 200 amps | Monterey County | $35,000 |
| Mar 14, 2026 | Electrical | Rev to s26-0006- install add'l (n) 200amp msp & enclosure | Salinas City | — |
| Mar 12, 2026 | Electrical | Residential roof mounted photovoltaic system. 2.64 kw 6 panels. Existing electrical panel will be used. 200 amps related to permit 23cp02978 to be installed on | Monterey County | $35,000 |
| Mar 12, 2026 | Electrical | Residential ground mounted photovoltaic system. 10.56 kw 24 panels, new 100 amp combiner sub panel. Existing electrical panel will be used. 400 amps | Monterey County | $35,000 |
| Mar 10, 2026 | Electrical | Residential ground mounted photovoltaic system. 10.56 kw 24 panels. Existing electrical panel will be used. 400 amps | Monterey County | — |
| Feb 17, 2026 | Electrical | 2.3kw- 4 module roof mount pv | Salinas City | — |
| Feb 5, 2026 | Electrical | Install two (2) franklin batteries 15kwh per ess to existing photovoltaic system. Using existing main service panel. | Monterey County | $37,660 |
| Jan 26, 2026 | Electrical | 11.04kw-24 modules- 1 enphase energy ess 10kwh | Salinas City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled6
- Active2
- Not stated1
- Completed1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.