Contractor · Electrical
POWER ON SOLAR
11 building permits since 2024 in Contra Costa County, CA; Menlo Park city, CA and Merced city, CA, across 4 counties — $59,500 in reported job value over 7 permits that state one.
- Building permits
- 11
- Reported job value
- $59.5K
- Active
- 2024–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Contra Costa County, CA6
- Menlo Park city, CA2
- Merced city, CA1
- Pleasanton city, CA1
- San Leandro city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar8
- Electrical5
- Battery storage3
- EV chargers3
- Accessory dwelling units1
- Remodels1
Permit types
As the building departments classify them.
- Electrical4
- E3
- PVR3
- PHOTOVOLTAIC SYSTEMS1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | PVR | PV solar roof mount 20 panels 8 kW DC & (2) ESS 27kWh Battery | Contra Costa County | $20,000 |
| Aug 24, 2026 | PVR | MAIN HOME - PV solar roof mount 20 panels 8kW DC | Contra Costa County | $15,000 |
| Aug 19, 2026 | PVR | ADU Home - PV Solar roof mount 5 panels 2 kW DC | Contra Costa County | $3,000 |
| Aug 3, 2026 | E | (1) AUTEL LEVEL 2 EV CHARGER | Contra Costa County | $1,500 |
| Jun 16, 2026 | E | Removing and Reinstalling Roof Mounted Solar originally under BIPVR23-013732 **ORIGINAL COPY OF COUNTY REVIEWED AND STAMPED PVR PLANS REQUIRED TO BE ON-SITE AT | Contra Costa County | $3,000 |
| Apr 28, 2026 | E | Removal and Re-Installation of 19 Solar Panels **ORIGINAL COPY OF COUNTY REVIEWED AND STAMPED PVR PLANS REQUIRED TO BE ON-SITE AT TIME OF INSPECTION** T CARDENA | Contra Costa County | $2,000 |
| Feb 5, 2026 | Electrical | Install ev charger - (1) charge point home flex ev charger | Pleasanton City | — |
| Jan 29, 2026 | Electrical | 1) rivian wall charger & (1) ev management system (dcc-12-50a) | San Leandro City | — |
Permit status
Where its permits stand, as the departments report them.
- Issued7
- Finaled4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.