Contractor · Electrical

POWER ON SOLAR

11 building permits since 2024 in Contra Costa County, CA; Menlo Park city, CA and Merced city, CA, across 4 counties — $59,500 in reported job value over 7 permits that state one.

Building permits
11
Reported job value
$59.5K
Active
2024–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Contra Costa County, CA6
  • Menlo Park city, CA2
  • Merced city, CA1
  • Pleasanton city, CA1
  • San Leandro city, CA1

Permits by year

By issue date (application date where there is none).

0510
10
20242026*
* 2026 is year to date.
View as table
YearPermits
20241
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar8
  • Electrical5
  • Battery storage3
  • EV chargers3
  • Accessory dwelling units1
  • Remodels1

Permit types

As the building departments classify them.

  • Electrical4
  • E3
  • PVR3
  • PHOTOVOLTAIC SYSTEMS1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026PVRPV solar roof mount 20 panels 8 kW DC & (2) ESS 27kWh BatteryContra Costa County$20,000
Aug 24, 2026PVRMAIN HOME - PV solar roof mount 20 panels 8kW DCContra Costa County$15,000
Aug 19, 2026PVRADU Home - PV Solar roof mount 5 panels 2 kW DCContra Costa County$3,000
Aug 3, 2026E(1) AUTEL LEVEL 2 EV CHARGERContra Costa County$1,500
Jun 16, 2026ERemoving and Reinstalling Roof Mounted Solar originally under BIPVR23-013732 **ORIGINAL COPY OF COUNTY REVIEWED AND STAMPED PVR PLANS REQUIRED TO BE ON-SITE AT Contra Costa County$3,000
Apr 28, 2026ERemoval and Re-Installation of 19 Solar Panels **ORIGINAL COPY OF COUNTY REVIEWED AND STAMPED PVR PLANS REQUIRED TO BE ON-SITE AT TIME OF INSPECTION** T CARDENAContra Costa County$2,000
Feb 5, 2026ElectricalInstall ev charger - (1) charge point home flex ev chargerPleasanton City—
Jan 29, 2026Electrical1) rivian wall charger & (1) ev management system (dcc-12-50a)San Leandro City—

Permit status

Where its permits stand, as the departments report them.

  • Issued7
  • Finaled4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.