Contractor · Electrical

PLATINUM WAVES ELECTRIC

11 building permits since 2024 in Marin County, CA — $38,350 in reported job value over 11 permits that state one.

Building permits
11
Reported job value
$38.4K
Active
2024–2026
Latest permit
Aug 3, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Marin County, CA11

Permits by year

By issue date (application date where there is none).

048
7
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
20253
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10

Permit types

As the building departments classify them.

  • RESIDENTIAL11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 3, 2026RESIDENTIAL—Marin County$4,300
Jan 7, 2026RESIDENTIALReplace 100AMP Sylvania sub panel with new 100AMP sub panel. Like for like swap, same location. Due to insurance requirements.Marin County$1,800
Jan 7, 2026RESIDENTIALReplace 100AMP Sylvania MSP with new 100AMP, same location. Replace Sylvania 100AMP sub panel with new 100AMP sub panel.Marin County$4,300
Jan 7, 2026RESIDENTIALReplace 100AMP Sylvania MSP with new 100AMP MSP, same location. Replace 100AMP Sylvania sub-panel with new 100AMP sub panel, same location.Marin County$1,100
Jan 7, 2026RESIDENTIALReplace 100AMP Sylvania MSP with new 100AMP MSP, same location.Marin County$2,500
Jan 7, 2026RESIDENTIALReplace 100AMP Sylvania MSP with new 100AMP MSP and replace 100AMP Sylvania sub-panel with new 100AMP sub-panel. Both stay in same location.Marin County$4,300
Jan 7, 2026RESIDENTIALReplace 100AMP Sylvania MSP with new 100AMP MSP and replace 100AMP sub-panel with new 100AMP sub panel. Sub panel to be relocated to outside of closet. MSP stayMarin County$4,300
Dec 11, 2025RESIDENTIALReplace existing sylvania 100AMP MSP with new one. Replace existing sub-panel with new like for like sub panel.Marin County$2,150

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.