Contractor · General building

PETITJEAN ROBERT C

11 building permits since 2000 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2000–2025
Latest permit
Apr 14, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

012
2
20002010201220142025
View as table
YearPermits
20001
20011
20101
20111
20122
20131
20141
20211
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar3
  • Gas1
  • HVAC1
  • Grading & excavation1
  • Remodels1
  • Roofing1
  • Bathrooms1
  • New construction1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 14, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure, install new sheathing as required with class-B or better approSanta Cruz County—
Mar 27, 2025BuildingExtension to permit B-216490, new expiration date is 09/26/2025.Santa Cruz County—
Nov 24, 2021BuildingMechanical permit to install/replace fans with associated venting for renovations at an existing habitable structure. Install listed smoke detectors and carbon Santa Cruz County—
Mar 10, 2014BuildingInstall a roof mounted Solar Photovoltaic system to the roof of an existing SFD. Not to exceed 3' above the roof ridge. Inspector may require plans or roof modiSanta Cruz County—
Dec 11, 2013BuildingInstall roof mounted Solar Photovoltaic system to the roof of an exisitng SFD. Not to exceed 3' above the roof ridge. Inspector may require plans or roof modifiSanta Cruz County—
Aug 16, 2012BuildingInspector to verify BP 78609 (RW) meets code to be finaled. Fire Damage Repair Construct a 290sq.ft. additiion at an existing 2-story 3 bedroom, 2 bath SFD to iSanta Cruz County—
May 21, 2012BuildingCO: Change Order to bp# 127959(GAR) for revised drainage details.Santa Cruz County—
May 19, 2011BuildingCO: Change Order to extend bp# B-101013(SI) to final BP# 127959(GAR) from 06/03/11 to 12/03/11.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Active2
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.