Contractor · HVAC

Permits by Pinecrest

11 building permits since 2022 in Rockville city, MD.

Building permits
11
Reported job value
—
Active
2022–2026
Latest permit
Sep 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Rockville city, MD11

Permits by year

By issue date (application date where there is none).

02.55
5
2022202420252026*
* 2026 is year to date.
View as table
YearPermits
20222
20241
20255
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC5
  • Demolition2
  • New construction2
  • Roofing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 28, 2026—Demolition of existing SFD in preparation for construction of new SFD (to be under separate permit).Rockville City—
Sep 17, 2026—Replace existing RTU (roof top unit) in kind.Rockville City—
Jun 18, 2026——Rockville City—
Oct 29, 2025—In kind replacement of existing RTU (roof top unit).Rockville City—
Sep 30, 2025—Repair damages to 8' section of front entry due to vehicle running through the wall.Rockville City—
Jun 17, 2025—Installation of whole house low voltageRockville City—
Jun 5, 2025—Complete demolition of existing SFD (to allow for construction of a new home). All materials to be removed - no new materials for this project.Rockville City—
Mar 5, 2025—Install a Cold Aisle Containment system for network equipment (to retain cool air) to include installation of 2 In-Row Cooling AC units (on 3rd Fl) and 2 outdooRockville City—

Permit status

Where its permits stand, as the departments report them.

  • Closed8
  • Issued2
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.