Contractor · General building

Paulo Caires

11 building permits since 2024 in Fitchburg city, MA; Bolton town, MA and Webster town, MA — $27,840 in reported job value over 2 permits that state one.

Building permits
11
Reported job value
$27.8K
Active
2024–2026
Latest permit
Aug 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Fitchburg city, MA9
  • Bolton town, MA1
  • Webster town, MA1

Permits by year

By issue date (application date where there is none).

02.55
5
202420252026*
* 2026 is year to date.
View as table
YearPermits
20244
20252
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing3
  • Bathrooms3
  • Accessory dwelling units2
  • Plumbing2
  • Kitchens1
  • Demolition1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Building Permit / Use and Occupancy9
  • Building Permit - Residential Projects1
  • Building Permit - Short Form1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 11, 2026Building Permit / Use and OccupancyADU proposed on basement of 81 townsend st. 2 bedrooms 1 bath. 670sf finish areaFitchburg City—
Jul 27, 2026Building Permit - Short Formremove old roof and install new shingle roof- also repair/replace back entry doorBolton Town$18,000
Jul 17, 2026Building Permit - Residential Projectsremove old roof and install new shingle roofWebster Town$9,840
Jul 14, 2026Building Permit / Use and Occupancyremove old roofing and install new shingle roof.Fitchburg City—
Jun 1, 2026Building Permit / Use and OccupancyDe- attach existing deck that connects 14 highland ave to 12 highland ave and move direction of existing stairway.Fitchburg City—
Dec 11, 2025Building Permit / Use and OccupancyCreate an ADU at basement of the unit 163 address. 1 bedroom 1 bath kitchen living room. the rough walls, plumbing and insulation has been previously inspected.Fitchburg City—
Sep 15, 2025Building Permit / Use and Occupancyfinish roughed in basements on units 167 and 165.Fitchburg City—
Jul 30, 2024Building Permit / Use and OccupancyPour cement floor on half basement, add a bathroom & sink, insulate walls, drywall.Fitchburg City—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.