Contractor · General building

PATRICK POWERS DESIGNS

11 building permits since 1995 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
1995–2022
Latest permit
Jan 6, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

01.53
3
1996200020032022
View as table
YearPermits
19951
19961
19991
20001
20022
20033
20071
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms7
  • Kitchens4
  • Additions4
  • Remodels3
  • Demolition2
  • Grading & excavation1
  • Roofing1
  • New construction1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 6, 2022BuildingWINTER GRADING PERMIT FOR 777 SUMMIT DRIVE (APP-211019). Batch ran @ 1/11/2023 8:16:23 PMSanta Cruz County—
Oct 25, 2007BuildingRPL: Construct a 1599sf. 3-story replacement SFD with 2 bedroom, 3 bath, kitchen, living room, family room, loft area, storage and 356sf. of decks. Project to iSanta Cruz County—
Sep 3, 2003BuildingConstruct a 2-story replacement SFD to include (4) bedrooms, (3) baths, great room, dining room, kitchen, laundry, covered entry porch, decks and covered patio.Santa Cruz County—
Jul 30, 2003BuildingDemo an SFD.Santa Cruz County—
Mar 17, 2003BuildingRoom addition to an existing 1-story SFD to include construct new pantry and extend dining room and master bath. Remodel to include convert bedroom #4 to laundrSanta Cruz County—
Aug 19, 2002BuildingSpecial inspection to verify structure is a SFD and does or does not meet code requirements to be relocated.Santa Cruz County—
Aug 19, 2002Building1.Special inspection to verify structure is a SFD and does or does not meet code requirements to be relocated. 2.Demolish an existing SFD.Santa Cruz County—
Jan 25, 2000BuildingConstruct 3-story addition at existing 1-story SFD to include garage at lower level, kitchen, family room, half bath, entry and storage at main level with bedroSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.