Contractor · General building
OLSON DAVID A & MICHELLE C TRUSTEES
11 building permits since 2015 in Santa Cruz County, CA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2015–2020
- Latest permit
- Sep 28, 2020
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Cruz County, CA11
Permits by year
By issue date (application date where there is none).
024
4
20152016201720192020
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 4 |
| 2016 | 2 |
| 2017 | 1 |
| 2019 | 1 |
| 2020 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Accessory dwelling units4
- Grading & excavation4
- Bathrooms4
- Pools & hot tubs3
- HVAC2
- Additions2
- Electrical2
- Solar1
- Remodels1
- Demolition1
Permit types
As the building departments classify them.
- Building11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 28, 2020 | Building | Construction Change Document #1 to building permit B-194773 for the following; Add another 30ft to great room area. Results in a total addition of 76sf. Elimina | Santa Cruz County | — |
| Jun 9, 2020 | Building | Remodel an existing 1,900 sq. ft. 2-story commercial space to include (2) cultivation rooms at the second floor and (3) process rooms at the first floor. See Di | Santa Cruz County | — |
| Jun 9, 2020 | Building | County Fire - SRA High Construct a 1-story 46 sq.ft. addition (under existing covered porch - no new impervious area) to an existing 2799sq.ft. 1-story 4 bedroo | Santa Cruz County | — |
| Feb 27, 2019 | Building | Demolition Permit to include removal of all illegal electrical back to main panel or subpanel at commercial condo # 3 on site with 9 other commercial condo unit | Santa Cruz County | — |
| Mar 15, 2017 | Building | Change order #2 to B-152702 (barn) to add a hydraulic lift. | Santa Cruz County | — |
| Aug 2, 2016 | Building | Change order to B-152703 to include revise site retaining wall construction. Change order to B-152702 to revise truss bracing. | Santa Cruz County | — |
| Mar 24, 2016 | Building | Install a roof mounted photovoltaic electrical system not to exceed 32 feet in height on a barn (under construction) on site with a SFD and ADU (under construct | Santa Cruz County | — |
| Sep 15, 2015 | Building | 1.Construct a 1-story, 800 sqft ADU with (1) bedroom, (1) bath, living room, dining area and attached trellis. On site with an existing SFD, pool house and swim | Santa Cruz County | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.