Contractor · General building
NOOR CONSTRUCTION GROUP LLC
11 building permits since 2017 in Minneapolis city, MN — $11,457,789 in reported job value over 11 permits that state one.
- Building permits
- 11
- Reported job value
- $11.5M
- Active
- 2017–2025
- Latest permit
- Mar 13, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN11
Permits by year
By issue date (application date where there is none).
012
2
2018202120232025
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 2 |
| 2020 | 2 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels6
- Windows & doors2
- HVAC1
- Bathrooms1
- Electrical1
Permit types
As the building departments classify them.
- Commercial10
- Res1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 13, 2025 | Commercial | REPLACE EQUIPMENT 2020 MSBC architect: 20111 - Hickey, William Dean @ COLLABERATIVE DESIGNGROUP engineer: 46731 - Lindahl, Ryan John @ HALLBERG ENGINEERING | Minneapolis City | $62,957 |
| Apr 18, 2024 | Commercial | Office Remodel - Tower A - Floors 15, 16, 17 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprink | Minneapolis City | $713,900 |
| Apr 26, 2023 | Commercial | ELEVATOR LOBBY IMPROVEMENT certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC occupant load: no change sprinklered: yes architect: D L | Minneapolis City | $59,432 |
| Dec 29, 2022 | Commercial | Interior remodel level 10 and structural infill on level 11 certificate of occupancy required: no special inspections required: no const type: 10A occupancy: B | Minneapolis City | $1,900,000 |
| Jun 8, 2021 | Commercial | INTERIOR REMODEL AND ADD TELE HEALTH ROOM AT PHARMACY (MAA) certificate of occupancy required: NO const type: II A occupancy: M 2020 MSBC occupant load: 29 spri | Minneapolis City | $39,500 |
| Feb 8, 2021 | Commercial | US BANK REMODELING certificate of occupancy required: no ***** special inspections required: no***** const type: II-B ***occupancy: B ***2020 MSBC***** occupant | Minneapolis City | $250,000 |
| Nov 10, 2020 | Commercial | (DMH - ProjectDox) WATER DAMAGE REPAIRS TO EXISTING 700 SQ.FT. BANK OFFICE SPACE AND VESTIBULE. REPLACE BROKEN WINDOWS. APPROVED PLANS AND PERMIT MUST BE ON SIT | Minneapolis City | $10,000 |
| Aug 27, 2020 | Commercial | remodeling and repairing target retail store due to riot, looting, fire and water damage. sck certificate of occupancy required yes ***** special inspections re | Minneapolis City | $3,000,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.