Contractor · Electrical

nicolas ramage

11 building permits since 2024 in Milton town, MA; Boston city, MA and Easton town, MA, across 4 counties — $30,450 in reported job value over 10 permits that state one.

Building permits
11
Reported job value
$30.5K
Active
2024–2025
Latest permit
Dec 17, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Milton town, MA3
  • Boston city, MA3
  • Easton town, MA1
  • North Attleborough Town city, MA1
  • Sharon town, MA1
  • Stoughton town, MA1
  • Hanover town, MA1

Permits by year

By issue date (application date where there is none).

048
7
20242025
View as table
YearPermits
20244
20257

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Remodels3
  • Bathrooms2
  • Electric meters2
  • HVAC1
  • Kitchens1
  • Additions1
  • Demolition1
  • EV chargers1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • ELECT.5
  • ELECTRICAL3
  • Electrical Permit2
  • Electrical Permit RESIDENTIAL One and Two Family1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 17, 2025Electrical Permit1st floor bathroom renovation. Make safe and demo existing wiring. Run new dedicated 20 amp circuit for bathroom outlets, and 1 dedicated 15 amp circuit for batHanover Town$2,000
Dec 16, 2025Electrical Permit RESIDENTIAL One and Two FamilyBasment renovation. 2 primary rooms: living room with kitchenette 25x18' . 2nd room proposed as gym area 25x 10'. No bathrooms. Will in include 1 closet for eleSharon Town$5,500
Dec 1, 2025ELECT.ev charger dedicated 60amp circuit for a charge point 48amp max ev charger.Milton Town$1,500
Nov 5, 2025Electrical PermitResidential-Additions/Alterations/Accessory StructuresNorth Attleborough Town City$8,000
Sep 11, 2025ELECT.wire standalone outdoor hot tub on rear exterior patio. installation calls for a dedicated 115 volt single pole, 15 amp circuit with gfci protection and a switcMilton Town$800
Jul 14, 2025ELECT.Full Service Replacement of existing 100amp service, with new 100amp service. Service Conductor Refeed, New Meter Main, New main panel to replace fused panel. SStoughton Town$3,750
Jun 16, 2025ELECTRICALELECTRICALBoston City$800
Jun 18, 2024ELECT.re-distribute 3 circuits into second 100 amp panel. replace outdoor meter with meter main and new riser. and add ground rods as needed. bond water main and add Milton Town$1,500

Permit status

Where its permits stand, as the departments report them.

  • Closed3
  • Finaled3
  • Active2
  • Completed2
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.