Contractor · HVAC
natan cantelli
11 building permits since 2025 in North Reading town, MA; Marshfield town, MA and Barnstable Town city, MA, across 5 counties — $171,000 in reported job value over 7 permits that state one.
- Building permits
- 11
- Reported job value
- $171K
- Active
- 2025–2026
- Latest permit
- Oct 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- North Reading town, MA3
- Marshfield town, MA2
- Barnstable Town city, MA1
- Sandwich town, MA1
- Andover town, MA1
- Braintree Town city, MA1
- Sharon town, MA1
- Duxbury town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 1 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC9
- Heat pumps2
- Remodels1
- Additions1
- New construction1
Permit types
As the building departments classify them.
- Sheet Metal Permit3
- SHT MTL3
- MECH2
- HVAC / Sheet Metal Permit1
- Mechanical Permit1
- *Sheet Metal/Heat Pump/Mini-Split Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 8, 2026 | *Sheet Metal/Heat Pump/Mini-Split Permit | addtion work, new slim duct unit. | Duxbury Town | $18,000 |
| Sep 25, 2026 | Sheet Metal Permit | New Air handler(slim duct) unit for the new additiion. 3 new supplies and 1 return all work is for the addition only | Marshfield Town | $15,000 |
| Sep 15, 2026 | Mechanical Permit | New Slim Duct unit Only for the Master Batroom renovayion/adition | Andover Town | $10,000 |
| Sep 15, 2026 | Sheet Metal Permit | Air handler in the basement, hydronic system, 2 zones, 1 for the 1st floor, both existing area and new area. And 1 zone for attic. Goodman condenser outside. | Marshfield Town | $30,000 |
| Aug 24, 2026 | SHT MTL | new air conditioning system, with one slim duct unit located in the basement, and 1 mini split system. new condenser for both of those system. for the master be | Braintree Town City | $25,000 |
| Jul 13, 2026 | Sheet Metal Permit | Renovation of the house, new air handler + condenser, new duct work, supply and returns | Barnstable Town City | $30,000 |
| Jun 23, 2026 | SHT MTL | — | Sandwich Town | — |
| May 7, 2026 | HVAC / Sheet Metal Permit | New House, single family, two new air handlers, one in the attic to supply the second floor and one in the basement for the first floor, along with two new cond | Sharon Town | $43,000 |
Permit status
Where its permits stand, as the departments report them.
- Active6
- Issued3
- Closed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.