Contractor · General building

murphy building co.

11 building permits since 2020 in Falmouth town, MA.

Building permits
11
Reported job value
—
Active
2020–2026
Latest permit
Mar 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA11

Permits by year

By issue date (application date where there is none).

01.53
3
202020222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20201
20222
20232
20243
20251
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms5
  • Remodels3
  • Demolition3
  • Kitchens2
  • Additions2
  • Plumbing2
  • Windows & doors2
  • Electrical1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • RESI.9
  • COMM.1
  • REP1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 30, 2026RESI.build a small addition to the right side of the house ( when facing 26 buzzards bay ave (the front side of the house)). the addition will fall within the existiFalmouth Town—
Jan 27, 2026RESI.remove existing stair well to enlarge the main floor bedroom and add an ensuite bathroom. removing the stairwell will also allow us to add a closet to the existFalmouth Town—
Dec 23, 2025RESI.build a small addition to the left side of the house ( when facing 26 buzzards bay ave (the front side of the house). the addition will fall within the existingFalmouth Town—
Dec 10, 2024RESI.renovate stairs to comply with current code. renovate 2 bathrooms. add 1 bathroomFalmouth Town—
Nov 12, 2024REPreplacing 12 marvin awning windows with marvin double hung (11) and marvin fixed awning (1) windows. no headers will be changed. the 11 double hungs have a u-faFalmouth Town—
Feb 22, 2024RESI.resurface 2 decks. kitchen paint, backsplash, counter top sink.Falmouth Town—
Dec 1, 2023RESI.demolish and rebuild a single family homeFalmouth Town—
Mar 9, 2023RESI.renovate master bathroomFalmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed7
  • Issued4

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.