Contractor · Demolition & excavation

moabe lima

11 building permits since 2025 in East Providence city, RI; Providence city, RI and Barrington town, RI, across 5 counties — $81,200 in reported job value over 9 permits that state one.

Building permits
11
Reported job value
$81.2K
Active
2025–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • East Providence city, RI2
  • Providence city, RI2
  • Barrington town, RI1
  • East Greenwich town, RI1
  • Warwick city, RI1
  • Portsmouth town, RI1
  • Woonsocket city, RI1
  • Hopkinton town, RI1
  • Narragansett town, RI1

Permits by year

By issue date (application date where there is none).

0510
9
20252026*
* 2026 is year to date.
View as table
YearPermits
20252
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels2
  • HVAC1
  • Grading & excavation1
  • Roofing1
  • Plumbing1
  • Demolition1
  • Electrical1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Building Permit10
  • EG Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026Building PermitStep 1 – Remove Existing Stairs Remove the existing stairs, railings, and damaged materials. Inspect the entrance area for structural damage. Remove all construWoonsocket City$1,700
Sep 9, 2026Building PermitSINGLE-FAMILY DWELLING EXTERIOR ALTERATIONS TO BUILD 9' X 12' WOOD DECK, FRAME, WOOD BOARD, AND WOOD RAILS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONALProvidence City$6,000
Sep 9, 2026Building PermitComposite Decking & New Railings Remove and dispose of all existing wood decking boards and old railings. Inspect the existing deck framing, including joists, bEast Providence City$12,000
Jul 28, 2026Building PermitWe’re going to remove the flooring and set it aside so it can be reinstalled later. We’ll also install new rails, and we’ll apply a membrane to protect against Portsmouth Town$8,000
Jul 28, 2026Building Permit—Hopkinton Town—
Jun 22, 2026Building Permit(Wood Deck replacement for composite) We will remove the floor rails and check out the frame and , install a new composite floor and new composite rails.Warwick City$10,000
May 21, 2026EG Building PermitVinyl siding installation over the shingles sidingEast Greenwich Town$15,000
May 19, 2026Building PermitFixing entry landing/stairs --- This project involves a replacement of an existing wooden deck, measuring 4 feet by 5 feet. The structure will remain wood, withBarrington Town$3,000

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.