Contractor · Plumbing
MIDSTATE MECHANICAL
11 building permits since 2007 in Mesa city, AZ — $1,318,200 in reported job value over 11 permits that state one.
- Building permits
- 11
- Reported job value
- $1.3M
- Active
- 2007–2026
- Latest permit
- Jun 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ11
Permits by year
By issue date (application date where there is none).
048
8
2007201120202026*
View as tableHide table
| Year | Permits |
|---|---|
| 2007 | 8 |
| 2011 | 1 |
| 2020 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing10
- HVAC9
- Remodels6
- Gas3
- Heat pumps3
- Roofing2
- Electrical2
- Water heaters2
- Demolition1
- Fire sprinklers1
Permit types
As the building departments classify them.
- Com (OTH) -- Plumbing9
- Other Commercial1
- Plumbing1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 15, 2026 | Other Commercial | Demo (5) existing RTU evaporative cooling units and install (5) new RTU heat pump units at existing building. New structural roof reinforcement, electrical conn | Mesa | $300,000 |
| Jun 11, 2020 | Plumbing | Remove gas water heater and install new electric one. | Mesa | $1,200 |
| Jun 23, 2011 | Com (OTH) -- Plumbing | INSTALL BURN OFF OVEN (SCTR-6 ) IN SUITE 104 FOR TIMKEN TO INCLUDE: MODIFY PLUMB. ADDING WATER AND GAS LINES AND INSTALLATION OF OVEN EXHAUST THRU ROOF. ( 300 C | Mesa | $2,000 |
| Dec 18, 2007 | Com (OTH) -- Plumbing | CITY OF MESA PROJECT #06-905-001 Install new water chiller and cooling tower and extend insulated chilled water piping and condenser water piping from chiller t | Mesa | $290,000 |
| Dec 18, 2007 | Com (OTH) -- Plumbing | CITY OF MESA PROJECT 06-905-001 Install 2-heat pump type water chillers in basement for hot water and heating, new insulated chilled/heating water pumps and pip | Mesa | $170,000 |
| Dec 18, 2007 | Com (OTH) -- Plumbing | CITY OF MESA PROJECT 06-905-001Replace one rooftop unit, provide new programmable supply air temp controller for VAV unit (no existing automation system exsists | Mesa | $50,000 |
| Dec 18, 2007 | Com (OTH) -- Plumbing | CITY OF MESA PROJECT 06-905-001 Remove 6- evap coolers and install 3-indoor and 1-outdoor evap cooled hot water coil make-up air units (structual modifications | Mesa | $185,000 |
| Dec 18, 2007 | Com (OTH) -- Plumbing | CITY OF MESA PROJECT 06-905-001 Install new hydronic plate and frame heat exchanger and concrete pad, extend insulated chilled water piping and condenser, water | Mesa | $55,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled7
- Issued3
- C/o issued1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.