Contractor · Electrical

MF ELECTRIC LTD

11 building permits since 2019 in Boulder city, CO — $45,750 in reported job value over 10 permits that state one.

Building permits
11
Reported job value
$45.8K
Active
2019–2025
Latest permit
Nov 3, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO11

Permits by year

By issue date (application date where there is none).

024
4
201920202021202320242025
View as table
YearPermits
20192
20204
20211
20231
20241
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Electric meters3
  • EV chargers2
  • Battery storage1
  • Kitchens1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Electrical Permit11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 3, 2025Electrical PermitUnit 2: We'll be installing a new electrical service via conduit run from the meter bank, to unit B ,in coordination with Xcel energy. In unit B we'll be instalBoulder$12,000
Oct 22, 2025Electrical Permit**VOID-Inspections not completed within 180 days** Replace existing 200-amp residential main service panel with new 200-amp panel in the same location. Like-forBoulder$4,000
Feb 15, 2024Electrical PermitInstall a new 200amp overhead electrical meter and panel. Install AFCI/GFCI combo breakers as per city code. Install 120volt 20amp GFCI circuit to kitchen. InstBoulder$12,000
Jun 30, 2023Electrical Permit*Voided for inactivity - no inspections within 180 days* REPLACING EXISTING SERVICEBoulder$2,750
Sep 24, 2021Electrical PermitWe?ll be bringing the electrical up to code for an ?after the fact? wet barBoulder$700
Nov 12, 2020Electrical Permit*Replacement of existing Electrical Panel (Load Center) to allow for additional slots. Current Panel is Full. Scope includes upgrade/replacement of XCEL Meter BBoulder$4,950
Nov 3, 2020Electrical Permit*Installation of 50 Amp NEMA 14-50 Outlet in Garage for use with EV Charger.Boulder$850
May 27, 2020Electrical Permit*Upgrading service from 100 amps to 200 amp. We?ll also be turning the former interior load center into a junction box and adding a new exterior load center to Boulder$4,000

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Void2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.