Contractor · Electrical

MARK A EPLING

11 building permits since 2022 in Columbia County, OR; Marion County, OR and Tillamook County, OR, across 3 counties — $45,000 in reported job value over 11 permits that state one.

Building permits
11
Reported job value
$45K
Active
2022–2026
Latest permit
Sep 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Columbia County, OR4
  • Marion County, OR2
  • Tillamook County, OR2
  • Salem city, OR2
  • Rockaway Beach city, OR1

Permits by year

By issue date (application date where there is none).

024
4
2022202320242026*
* 2026 is year to date.
View as table
YearPermits
20224
20232
20243
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Solar4
  • Demolition2
  • Gas1
  • Electric meters1
  • New construction1

Permit types

As the building departments classify them.

  • Residential Electrical8
  • Commercial Electrical3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 8, 2026Commercial Electrical-Power for (2) new gate motorsColumbia County$3,000
Jun 16, 2026Residential ElectricalMark Schoch-339 N Pacific -Replace existing meter base with newRockaway Beach city$5,000
Dec 18, 2024Residential ElectricalTemporary service for construction of (2) new out buildings.Columbia County$2,000
Dec 10, 2024Residential Electrical(1) new out-buildingsColumbia County$5,000
Apr 10, 2024Residential ElectricalInstall Temp Service for New Construction Detached Single Family HomeColumbia County$1,000
Feb 28, 2023Residential ElectricalDemo existing 200 amp panel Install new, 200 amp, main breaker panel Install 60 amp, 240 volt PV circuit Re-establish grounding electrode systemSalem City$5,000
Feb 28, 2023Residential ElectricalFF- Elsie Harvey Demo existing 200 amp panel Install new, 200 amp, main breaker panel Install 60 amp, 240 volt PV circuit Re-establish grounding electrode systeMarion County$5,000
Nov 2, 2022Residential ElectricalFF-Blackburn 1 200A SERV AND 1 BC ONLY FOR 200 amp service upgrade. 200 amp panel upgrade. Installing (1) 60 amp circuit for future PV.Marion County$8,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled7
  • Issued4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.