Contractor · HVAC

Kropp Environmental Contractor

11 building permits since 2020 in Plainfield town, CT; Putnam town, CT and Thompson town, CT, across 2 counties — $427,155 in reported job value over 11 permits that state one.

Building permits
11
Reported job value
$427.2K
Active
2020–2025
Latest permit
Jun 24, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Plainfield town, CT3
  • Putnam town, CT2
  • Thompson town, CT2
  • Woodstock town, CT2
  • Voluntown town, CT1
  • Colchester town, CT1

Permits by year

By issue date (application date where there is none).

02.55
5
2020202320242025
View as table
YearPermits
20201
20232
20245
20253

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC5
  • Grading & excavation3

Permit types

As the building departments classify them.

  • Building8
  • Mechanical3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 24, 2025BuildingUnknown size fuel oil underground storage tank (UST) estimated to be 6,000-gallons. Overburden will be excavated and product remaining will be vacuumed. If remoPlainfield Town$25,174
May 6, 2025BuildingRemoving lally column to access underlying contaminated soil. Four temporary columns will be installed prior to removal. Following the excavation of soil utilizThompson Town$56,571
Jan 17, 2025BuildingRemoval of a 1,000-gallon heating oil underground storage tank. Overburden will be removed to expose the top of the tank. Soil will be removed from the inside oPutnam Town$7,000
Oct 30, 2024BuildingInstall eight (8) tank foundation supports inside pre-existing AST containment to accept two (2) 25,000-gallon above ground storage tanks. Pour one (1) concretePutnam Town$54,000
Oct 24, 2024Building1,000-gallon No. 2 heating oil underground storage tank abandonment in place. Excavating overburden above tank, powerwashing inside, collecting samples from undVoluntown Town$9,260
Aug 8, 2024BuildingRemoval of 1,000-gallon #2 fuel oil USTWoodstock Town$4,950
Jun 25, 2024BuildingUnderground storage tank removalThompson Town$229,000
Jan 2, 2024Mechanical275-gallon aboveground storage tank removal from basement, install of 275-gallon aboveground storage tank outside on concrete pad.Plainfield Town$6,600

Permit status

Where its permits stand, as the departments report them.

  • Approved6
  • Closed4
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.