Contractor · Electrical
Kravtsov Bogdan & Leah Kravtsov
11 building permits since 2020 in Santa Cruz County, CA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2020–2024
- Latest permit
- Mar 1, 2024
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA11
Permits by year
By issue date (application date where there is none).
048
8
2020202120232024
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 1 |
| 2023 | 8 |
| 2024 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical4
- HVAC2
- Plumbing2
- Water heaters2
- Solar1
- Battery storage1
Permit types
As the building departments classify them.
- Building11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 1, 2024 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Construction Change Document #1 to Permit B-235900 to i | Santa Cruz County | — |
| Dec 19, 2023 | Building | Siding permit to replace exterior siding/stucco and trim > 5,000 sq ft at an existing structure. Install listed smoke detectors and carbon monoxide alarms or co | Santa Cruz County | — |
| Nov 1, 2023 | Building | Mechanical permit to install new/replacement force Air Unit/ air condition unit with associated piping and venting to an existing habitable structure. Install l | Santa Cruz County | — |
| Oct 25, 2023 | Building | Mechanical permit to install new/replacement force Air Unit/ air condition unit with associated piping and venting to an existing habitable structure. Install l | Santa Cruz County | — |
| Oct 10, 2023 | Building | Replace electrical service panel with a new <400A service panel at an existing structure. Install listed smoke detectors and carbon monoxide alarms or combinati | Santa Cruz County | — |
| Sep 19, 2023 | Building | Installation of a new Telsa 40.5 kWh (3) batteries, energy storage system at an existing SFD. Install or verify listed smoke detectors and carbon monoxide alarm | Santa Cruz County | — |
| Jul 18, 2023 | Building | Construction Change Document #1 to Permit B-232050 to include that MP3 and MP4 have exposed beams and mounting hardware updated to use zilla for the mounting pl | Santa Cruz County | — |
| Mar 22, 2023 | Building | Central FPD/SRA High *Property owner to address VOID permit B-202936 prior to final. Go on line and check the status of your application, correction and approva | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.