Contractor · Electrical
JUSTIN LATHAM
11 building permits since 2024 in Memphis city, TN; Shelby County, TN and Germantown city, TN.
- Building permits
- 11
- Reported job value
- —
- Active
- 2024–2025
- Latest permit
- Apr 17, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Memphis city, TN5
- Shelby County, TN4
- Germantown city, TN1
- Millington city, TN1
Permits by year
By issue date (application date where there is none).
048
8
20242025
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 8 |
| 2025 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- Generators9
- Telecom6
- Electric meters1
Permit types
As the building departments classify them.
- COMMERCIAL ELECTRICAL PERMIT11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 17, 2025 | COMMERCIAL ELECTRICAL PERMIT | Existing 160' monopole. Adding WUC and generator on 10x17 concrete pad. Installing antennas and radios on existing tower | Shelby County | — |
| Apr 17, 2025 | COMMERCIAL ELECTRICAL PERMIT | Colocate on existing 150' monopole cell tower. Will be adding antenna and radio to existing structure. Will be installing WUC and generator on 10x17 foot pad at | Memphis city | — |
| Jan 15, 2025 | COMMERCIAL ELECTRICAL PERMIT | Colo site with existing 190'-0" monopole and installation of proposed wuc and generator on a 10'x17' concrete pad | Shelby County | — |
| Oct 28, 2024 | COMMERCIAL ELECTRICAL PERMIT | Proposed colo at 160'-0" rad center and installation of a vertiv wuc on a 10'x17' pad with a generac 20kw compact generator | Germantown city | — |
| Sep 10, 2024 | COMMERCIAL ELECTRICAL PERMIT | Colocation site with existing 120' monopole with installation of proposed WUC and generator on 10x17 pad. Antennas and radios will be added to existing tower. | Memphis city | — |
| May 22, 2024 | COMMERCIAL ELECTRICAL PERMIT | Proposed colo at 120' rad center. Installation of a delta wuc on a 10x17 foot pad with a generac compact 30kw diesel generator | Millington city | — |
| Mar 20, 2024 | COMMERCIAL ELECTRICAL PERMIT | Proposed colo at 142'-0" rad center and installation of a delta wuc on a 10'x17" pad with a generac compact 30kw diesel generator. | Memphis city | — |
| Feb 9, 2024 | COMMERCIAL ELECTRICAL PERMIT | Proposed colo at 145'-0" rad center and installation of purcel wic with a generac 30kw generator | Memphis city | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.