Contractor
Jonathan Winslow
11 building permits since 2024 in Bellevue city, WA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2024–2026
- Latest permit
- Sep 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bellevue city, WA11
Permits by year
By issue date (application date where there is none).
048
8
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 2 |
| 2026 (YTD) | 8 |
Permit types
As the building departments classify them.
- TK7
- DC2
- SA1
- UC1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 24, 2026 | TK | Installation of 50 pole banners over the sidewalk in two general locations - Old Bellevue and BelRed Arts District. These would be in the ROW over the sidewalk, | Bellevue City | — |
| Sep 24, 2026 | TK | Installation of one of two Eastgate Neighborhood Signs (other West). Grizzly Flats rock monument sign with name Eastgate inscribed on it setback from roadway at | Bellevue City | — |
| Sep 2, 2026 | SA | Eastgate Neighborhood Signage - West & South | Bellevue City | — |
| Aug 20, 2026 | TK | Installation of one of two Eastgate Neighborhood Signs (other South). Grizzly Flats rock monument sign with name Eastgate inscribed on it setback from roadway a | Bellevue City | — |
| Aug 7, 2026 | TK | Replacing existing drinking fountain in ROW with a drinking fountain that includes bottle filler station and pet fountain, similar to those in other COB Parks. | Bellevue City | — |
| Jul 10, 2026 | UC | Replacing existing drinking fountain with a new bottle filler station. Drinking fountain is located in the ROW along the NE 6th St Pedestrian Corridor. | Bellevue City | — |
| Apr 17, 2026 | TK | Series of small-scale improvements in the right of way consisting of relocation, painting, repair, installation, removal - valued at about 46k dollars. Phase I: | Bellevue City | — |
| Feb 3, 2026 | DC | Conducting a series of small state of good repair improvements to implemented mostly along the NE 6th Street Pedestrian Corridor of the Grand Connection in Down | Bellevue City | — |
Permit status
Where its permits stand, as the departments report them.
- Issued4
- Closed3
- Cancelled2
- Active1
- Pending1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.