Contractor · Electrical
Joaquin Sanchez
11 building permits since 2025 in Valley Stream village, NY.
- Building permits
- 11
- Reported job value
- —
- Active
- 2025
- Latest permit
- Apr 10, 2025
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Valley Stream village, NY11
Type of work
Permits describing each kind of work; one permit can cover several.
- Telecom11
- Electrical11
- Electric meters11
Permit types
As the building departments classify them.
- Electrical Permit Application11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 10, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front of each address. a 200a meter pan is being installed along with a disconnect. 40.6 | Valley Stream Village | — |
| Apr 10, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front of each address. a 200a meter pan is being installed along with a disconnect. 40.6 | Valley Stream Village | — |
| Apr 10, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front of each address. a 200a meter pan is being installed along with a disconnect. 40.6 | Valley Stream Village | — |
| Apr 10, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front of each address. a 200a meter pan is being installed along with a disconnect. 40.6 | Valley Stream Village | — |
| Feb 11, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front. A 200a meter pan is being installed along with a disconnect | Valley Stream Village | — |
| Feb 4, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front of each address. A 200a meter pan is being installed along with a disconnect | Valley Stream Village | — |
| Feb 4, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front . A 200a meter pan is being installed along with a disconnect | Valley Stream Village | — |
| Feb 4, 2025 | Electrical Permit Application | Upgrade of existing telecommunications equipment on the utility pole in front. A 200a meter pan is being installed along with a disconnect | Valley Stream Village | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.